Inside BJS Ceramics' EIC Accelerator Project on Silicon Carbide

7 October 20262,176 words11 min

BJS Ceramics GmbH, a small company in Gersthofen near Augsburg, set out to do something no European firm had done: make silicon carbide (SiC) fibres, the reinforcement inside the ceramic composites that let jet engines run hotter, on an industrial scale. In the 9 January 2019 cut-off of the EIC SME Instrument Phase 2, the forerunner of the EIC Accelerator, the European Commission selected its project SPE, "Silicon-Carbide-Fiber Pilot-production in Europe", according to the EC list of selected companies. The EU contributed €2.5 million to a total cost of €4,208,750, from 1 July 2019 to 31 December 2021, according to CORDIS. The company's final report says the pilot production was established and the first SiC fibres ever made in the EU were tested. The step it promised next, a commercial fibre plant "in the mid-2020ies", has not been announced.

The company is active. Its register file shows a capital increase on 20 March 2026 and annual accounts for 2024 published in November 2025, according to North Data, and its website lists its fibres, its sister company and a production address in Bayreuth.

€2.5MEU grant for SPE, 2019
€4.21MTotal project cost
Feb 2021First fibres on the Bayreuth pilot line
~10%Stake bought by ITP Aero, 2023

Company file

Legal entity
BJS Ceramics GmbH, Augsburg local court HRB 29151
Registered
November 2014, as a carve-out of the SiC fibre business of SGL Carbon
Address
Siemensstraße 6a, Gersthofen; production in Bayreuth-Wolfsbach
Management
Armin Bruch (co-founder, managing director), Dr Werner Humbs (managing director); Jutta Schull (co-founder)
Investor
ITP Aero, about 10% since April 2023
Products
Silafil SiC fibres, preceramic polymers, coatings
Sister company
BJS Composites GmbH (Keraman ceramic composites)
Share capital
€157,670 since March 2026
Staff and revenue
Not public

Where BJS Ceramics Stands Now

BJS Ceramics still describes itself as a developer and producer of non-oxide ceramic fibres and runs alongside BJS Composites GmbH, which makes ceramic matrix composite (CMC) parts under the Keraman brand at the same Gersthofen address, according to its company page. The page names Armin Bruch and Dr Werner Humbs as managing directors, matching the directors recorded in the register since 2015 on North Data. The company holds DIN EN ISO 9001:2015 and EN 9100:2018 certificates, the second being the quality standard for aerospace suppliers, and lists mobility, space, energy, defence and water management as markets.

Its most recent public research project is HärPy, which ran from 1 November 2023 to 31 October 2025 with BJS Ceramics as coordinator and the Fraunhofer Center HTL as partner, funded by the Bavarian economy ministry with €200,000 for Fraunhofer's share, according to Fraunhofer HTL. Its goals were faster throughput "while maintaining the highest fiber qualities and industry-standard reject rates", better curing and pyrolysis, and more automation. Those are the problems of a line still being tuned at pilot scale, two years after SPE ended.

The record

From SGL Carbon carve-out to a pilot line and a strategic investor

BJS Ceramics produced its first fibres on the Bayreuth pilot line in February 2021, about two years later than its EU proposal planned. The commercial plant it announced for the mid-2020s has not been announced as built.

  1. Nov 2014Registered in AugsburgHRB 29151, share capital €30,000
  2. Jul 2015SiCTec3 startsBavarian-funded fibre project with Fraunhofer HTL and MTU
  3. Jan 2019EIC SME Instrument Phase 2 cut-offSPE selectedgrant only
  4. Apr 2019Pilot plant building opensFraunhofer HTL, Bayreuth, €20M
  5. Jul 2019SPE starts€2.5M EU grant
  6. Feb 2021First fibres on the pilot lineSilafil SiC fibres
  7. Dec 2021SPE endsSix months later than first announced
  8. Apr 2023ITP Aero takes about 10%Price not disclosedinvestor
  9. Nov 2023HärPy startsBavarian project on curing and pyrolysis, to Oct 2025
  10. Mar 2026Share capital raisedTo €157,670

North Data, CORDIS project 858389, Fraunhofer Center HTL, BJS Ceramics and Composites United.

Revenue, staff and results are not public. North Data holds BJS Ceramics' balance sheets from 2014 to 2024 behind a paywall, and no free source for the figures was found. The register dates show that the accounts for 2022 were published in June 2025 and those for 2023 in February 2025. Dealroom puts the headcount at 11 to 50, a band that could not be checked against a filing.

The Technology: A Different Route to the Fibre

SiC fibres are woven into preforms and embedded in a silicon carbide matrix to make SiC/SiC composites. These parts are about a third of the weight of nickel superalloys and survive temperatures that would melt them, so engines built with them can burn hotter and more efficiently. The CORDIS summary gives the heat resistance as 260°C higher than nickel-based superalloys. When SPE was proposed, there were "only 2 SiC fiber producers in Japan" and one plant under construction in the United States "in close cooperation with the US Air Force", and the fibres are dual-use goods under export control, the project objective says.

BJS Ceramics was set up in 2014 to take over the SiC fibre business and technology of SGL Carbon, according to Dealroom and the company profile on Composites United; the register entry dates from 5 November 2014. The established fibres are spun from polycarbosilane. BJS Ceramics has developed a process that starts from polysilanes instead, according to Fraunhofer HTL, and holds German and international patents on chlorine-free preceramic polymers and high-molecular polysilanes, filed from 2014 and listed on North Data. The company's final EU report claims its route "requires less production steps, delivers higher yields at less energy input" than its overseas competitors. No independent comparison of cost or fibre properties was found. On Bayern Innovativ, the company also markets fibres with "programmable functionalities" for low-observability military uses, rocket propulsion and nuclear fission and fusion components.

"With the end of the project, we successfully established an industrial fiber pilot production in Europe that will meet the requirements of industrial customers very short-term, and our aviation customers' requirements by the end of 2022!"

BJS Ceramics, final periodic report for SPE, CORDIS

What SPE Promised, and What the Record Shows

The proposal assumed the technology would reach TRL 4 to 5 by the end of 2018 and that "in 2019, the first European SiC fiber line in Bayreuth will start production", according to CORDIS. The building for that line, a fibre pilot plant owned by the Fraunhofer Center HTL, opened on 12 April 2019 at a cost of €20 million, with BJS Ceramics named as the first industry partner on the non-oxide line, according to the Fraunhofer press release. Fraunhofer's director told the trade journal cfi that the first line would go into operation at the end of 2019, with each line able to make "several tonnes per year". The two sources differ on the building's usable area: 1,500 m² in the press release, 2,000 m² in the cfi article.

BJS Ceramics began producing SiC fibres on the pilot line in February 2021, according to a company profile published by Composites United, and its own history dates the launch of the Silafil F fibre to 2021. That is roughly a year and a half after the proposal's 2019 target. The company's announcement of the grant gave the project period as July 2019 to June 2021; CORDIS records the end as 31 December 2021, six months later.

The pilot plant

Who paid for the €20M fibre pilot plant in Bayreuth

The plant that BJS Ceramics uses belongs to the Fraunhofer Center HTL. The federal government and Bavaria each paid about €8M, Fraunhofer the remaining almost €4M.

Fraunhofer Center HTL press release, 12 April 2019. Approximate values in € millions.

The final periodic report, covering July 2020 to December 2021, lists five results: the upscaling of the raw material supply on the basis of BJS patents, the transfer of the process from lab scale to the industrial pilot line, a quality management system, successful processing tests of the first EU-made fibres by BJS Composites, and contacts with "several EU and oversea's key players" that led to "first shipments". It names no customer and gives no production volume. CORDIS lists no deliverables or publications for the project.

  1. Start up the Bayreuth pilot productionDeliveredProduction from February 2021, per Composites United and the final report.
  2. Production starts in 2019MissedFirst fibres in 2021; project extended by six months.
  3. Quality system and raw material supplyDeliveredReported by the company; EN 9100 certificate shown on its website.
  4. Meet aviation customers' requirements by end of 2022Not verifiedNo customer qualification announced; ITP Aero invested in 2023.
  5. Commercial fibre plant in the mid-2020sNot achievedNo plant announced; 2023 to 2025 work still at pilot scale.

The project budget

The EU paid 59% of the €4.21M SPE project

Of the €2.5M grant, €2,484,163 went to BJS Ceramics and €15,837 to its sister company BJS Composites as a linked third party.

CORDIS, project 858389. Values in € millions.

The EC list names BJS Ceramics alone for SPE. CORDIS records BJS Composites GmbH, at the same address, as a linked third party that received €15,837 of the grant.

The Investor and the Money

In April 2023 ITP Aero, the aero-engine component maker based near Bilbao, bought about 10% of BJS Ceramics, and the two agreed to develop next-generation ceramic fibres and CMC components for aero-engines together, with "a secure all-European supply-chain", according to the company's announcement, which the Bavarian aerospace cluster bavAIRia and Composites United published. The price and other terms were kept confidential. No supply contract, engine programme or CMC part from the partnership has been made public since.

The register shows the money side only in outline. The share capital, €120,000 since March 2015, rose to €133,185 in April 2023, the month of the ITP Aero deal, then to €136,363 in July 2023, €142,045 in June 2025 and €157,670 in March 2026, according to North Data. Each increase means new shares were issued, but how much investors paid for them, and who the six shareholders North Data counts are, is not public without a paid record.

The share capital

Four capital increases since 2023

The registered share capital stood at €120,000 from 2015 until April 2023, the month ITP Aero's stake was announced. It has risen four times since. The prices paid for the new shares are not public.

Register publications as listed by North Data. Values in euros.

Before and around the EIC grant, BJS Ceramics relied on public research money. It was a partner with the Fraunhofer Center HTL and MTU Aero Engines in SiCTec3, a €3.2 million Bavarian project from July 2015 to March 2019 that took the polysilane route to TRL 4, according to Fraunhofer HTL. It was a partner in TRANSFER, an EIT RawMaterials project led by Fraunhofer from January 2020 to December 2022 to prepare the commercialisation of SiC fibres, according to EIT RawMaterials. North Data also lists a federal grant of €661,243 from November 2018 for CMC_TraTurb, on CMC structures for gas turbines. SPE is the only project of the company on CORDIS. The EIC Fund made no investment: the award was a grant, and the company is not among the 301 organisations on the EIC Fund's list of invested companies.

Why Europe Should Care

SiC fibres sit where several EU priorities meet: cleaner aviation, hydrogen-ready turbines, fusion, and defence materials that today come from Japan and the United States under export licences. The Commission's February 2024 communication on advanced materials for industrial leadership names reducing dependencies on critical materials, and materials for planes, space launchers and dual-use and defence equipment, as reasons to act. A European fibre source is exactly the kind of capability that policy describes, and the €20 million that German federal and Bavarian budgets and Fraunhofer put into the Bayreuth plant shows public money has already been committed to it.

What the company said

Production in Bayreuth from 2019, aviation customers' requirements met by the end of 2022, and a commercial fibre plant in the mid-2020s.

What the record shows

Pilot production from 2021 in a Fraunhofer plant, an aerospace investor with about 10%, and a 2023 to 2025 project still aimed at throughput and reject rates. No commercial plant or named customer.

The Verdict

A working pilot, not yet an industry

SPE did what its name says: Europe has a silicon carbide fibre pilot production, and BJS Ceramics runs it. The jump to a commercial plant and qualified engine parts, which the grant was meant to prepare, has not been made public five years after the project ended.

What cannot be checked

Fibre output, prices, customers, revenue, staff, losses, the amounts raised in the capital increases, and whether the end-2022 aviation target was met are not public. BJS Ceramics, ITP Aero and the EIC were not asked for comment for this article, which is based on public records and published statements linked throughout.

Industry

Materials and chemicalsAdvanced materials

Focus
  • Composites
Technologies
  • Functional materials
Keywords
  • Silicon carbide
  • Ceramic matrix composites
  • Aero-engines
  • Ceramic materials