Copenhagen Atomics' EIC Accelerator Plan to Burn Waste With Thorium

21 October 20261,037 words6 min

The pitch is almost too good: a reactor that fits inside a 40-foot shipping container, burns the waste other reactors leave behind, breeds its own fuel from thorium, and could be mass produced at one unit a day per assembly line for €20 a megawatt hour. Copenhagen Atomics, based in Kastrup outside Copenhagen, calls its reactors Waste Burners: molten salt, moderated by unpressurised heavy water, fuelled with a fluoride salt of lithium, thorium and low-enriched uranium, with 100MW of thermal output.

The EIC Accelerator selected the project, Th-MSR, at its March 2025 cut-off for blended finance, and CORDIS records a grant of €2,499,999 from January 2026 to December 2027. The waste claim is the project's strongest argument: spent fuel from these reactors would need above-ground storage for 300 years, against 100,000 years of deep geological storage for conventional waste.

€2.5MEIC Accelerator grant for Th-MSR
300 yearsWaste storage claimed, against 100,000
€20/MWhElectricity cost claimed at mass production

Company file

Legal entity
Copenhagen Atomics A/S, Oliefabriksvej 77, Kastrup, Denmark
Subsidiary
UK Atomics, which plans to build, own and operate reactors as an energy service
Design
Containerised thorium molten salt reactor, 100MW thermal, heavy water moderated, called the Onion Core in the Swiss experiment
Research partner
Paul Scherrer Institute, Switzerland, under a four-year agreement from July 2024
Other engagements
UK generic design assessment entry application; a Danish-Indonesian study of 25 modules for an ammonia plant; an agreement with Turkey's energy ministry on thorium in September 2026
CTO
Aslak Stubsgaard
EIC project
Th-MSR, agreement 101248098, January 2026 to December 2027

The experiment that would settle it

In July 2024 Copenhagen Atomics signed a four-year experimental collaboration with Switzerland's Paul Scherrer Institute for what would be the first critical experiment on a thorium molten salt reactor in Europe, using the company's Onion Core design at PSI's facilities, scheduled for 2026 to 2027, as World Nuclear News reported. The stated aims go beyond the company: build partner experience in design, construction, licensing, operation and decommissioning, and release open-source data for validating reactor modelling tools.

That experiment is the difference between an engineering programme and a claim. As of October 2026 no start or result has been reported, and the company's own first commercial reactor date, 2028, was set before the experiment was scheduled. CORDIS shows no periodic report for the EIC project, which only began in January 2026.

The waste argument

Three hundred years instead of a hundred thousand

The project's central claim: waste from its reactors would need above-ground storage for 300 years, against 100,000 years of deep geological storage for conventional spent fuel.

CORDIS, Th-MSR project summary. Years of storage required.

What has actually been built

The company's verifiable progress is at component level, and it is not trivial. It produces and tests full-scale prototypes at its Copenhagen site along with dozens of smaller loop tests and salt production, and in February 2026 its molten salt pump completed two years of continuous operation at high temperature. Pumps and valves in hot fluoride salt are exactly where molten salt programmes have historically failed, so a pump that runs for two years is a real result, and more informative than any cost projection.

What does not exist is a licence. Molten salt reactors have no precedent in European regulation, the UK design assessment is an entry application, and the Turkish and Indonesian engagements are agreements and studies rather than orders.

The economics claimed

€20 a megawatt hour, at mass production

The project claims a levelised cost of electricity of €20/MWh once reactors are mass produced at one per day per assembly line, which would make it among the cheapest sources of low-carbon power in the 2030s. The reactor's thermal output is 100MW.

CORDIS, Th-MSR project summary; World Nuclear News.

The plan

Mass-produced containerised thorium reactors burning nuclear waste at €20/MWh, with the first commercial unit operating in 2028 and assembly lines turning out one a day.

The record so far

Full-scale component prototypes, a salt pump running two years continuously, a Swiss partner for a critical experiment and international agreements; no criticality, no licence and no reactor.

  1. Components in hot saltTestedMolten salt pump ran two years continuously to February 2026.
  2. Critical experimentScheduledWith PSI for 2026 to 2027; no start reported.
  3. Regulatory pathEarlyA UK generic design assessment entry application.
  4. €20/MWh at mass productionProjectionDepends on assembly lines that do not exist.

A grant that is small next to the task

The €2.5 million grant is a fraction of what any reactor programme costs, and secondary accounts of the award describe access to up to €15 million of EIC equity alongside it, which has not been announced as invested. Separate coverage reports a €20 million round, undated in the sources found, and the company is privately held with no published accounts, so its total funding is not verifiable here. Its commercial model through UK Atomics, owning and operating reactors and selling energy as a service, is a way to avoid asking utilities to buy an unlicensed machine.

The record

A reactor in a shipping container, aiming for criticality in Switzerland

Copenhagen Atomics' design is a containerised molten salt reactor moderated by unpressurised heavy water, burning nuclear waste while breeding fuel from thorium.

  1. 2023UK and Indonesia movesSubsidiary UK Atomics applies for a generic design assessment; a Danish-Indonesian study looks at 25 modules powering an ammonia plant
  2. Jul 2024PSI collaborationFour-year agreement with Switzerland's Paul Scherrer Institute for Europe's first thorium molten salt critical experiment, scheduled for 2026 to 2027
  3. 2025EIC awardA €2.5M grant with access to up to €15M of equity, per Wikipedia's account of the award
  4. Feb 2026Pump milestoneThe molten salt pump completes two years of continuous operation at high temperature
  5. Jan 2026Th-MSR project startsTwo years of EIC funding for the waste-burning thorium reactor€2.5M
  6. Dec 2027Th-MSR endsScheduled end of the EIC project; the first commercial reactor was scheduled for 2028Scheduled

CORDIS; World Nuclear News, 1 July 2024; Nuclear Engineering International; Silicon Canals.

Burning the waste Europe already has

Europe is storing tens of thousands of tonnes of spent fuel with no operating deep repository outside Finland, and the political cost of that is as high as the financial one. A reactor that consumes it and shortens the storage problem from geological to civilisational timescales is therefore attractive to governments in a way that a conventional small modular reactor is not. That is the argument behind this grant, and it is also why the Swiss experiment is being set up to publish open data: the stated aim is open-source data for validating reactor modelling tools, and molten salt reactors have no precedent in European regulation.

Verdict

Copenhagen Atomics reports progress on the unglamorous part of molten salt engineering, and a pump that the company says has run two years in hot salt is worth more than most of the claims in this cut-off. The claims themselves are extraordinary: €20 a megawatt hour, a reactor a day, waste reduced from 100,000 years to 300. None of it is testable until something goes critical in Switzerland, and that has not happened.

Industry

EnergyNuclear energy

Focus
  • Small modular reactors
Technologies
  • Nuclear engineering
  • Molten salt technology
Keywords
  • Thorium
  • Nuclear waste
  • Baseload power
  • Mass production