D-Orbit and the EIC Accelerator: A Robotic Arm for Satellite Repair

30 September 2026890 words5 min

D-Orbit, founded in 2011 near Como, runs ION, a space tug that carries satellites to their final orbits, and is developing GEA, a robotic spacecraft to inspect, dock with, reposition and extend the life of satellites in geostationary orbit. It was selected in the EIC Accelerator's June 2023 cut-off with blended finance and received an EU grant of €2.50 million for ASTROLIFT, a €4.20 million project from February 2024 to April 2026, according to CORDIS. The project covers one key component: a torque-controlled robotic joint for GEA's robotic arm.

The only public report, to January 2025, says D-Orbit completed the requirements and architecture for the joint and preliminary specifications for the whole arm, while the mechanical design, torque sensor and control software for a breadboard model were "ongoing" and its components were being procured, with the model to be "manufactured and then tested" in later phases, according to the CORDIS reporting page. The project ended in April 2026 without a public final report or announced test results. GEA's first mission, RISE, developed with the European Space Agency, is "scheduled for launch in 2029", according to D-Orbit.

€2.50MEU grant
€119.6MESA contract for RISE
$53MSeries D, January 2026
2029First servicing mission

Company file

Legal entity
D-Orbit SpA, Fino Mornasco (Como)
CEO
Luca Rossettini
Main product
ION Satellite Carrier
In development
GEA servicing spacecraft
EIC component
Torque-controlled robotic joint
Lead investor, 2026
Azimut Group
EIC funding
Blended finance

Where D-Orbit Stands Now

In October 2024 D-Orbit signed a €119.6 million contract with ESA for RISE, Europe's first life-extension mission for a geostationary satellite, according to SpaceNews. In January 2026 it closed a $53 million Series D led by Azimut Group, "earmarked for strategic mergers and acquisitions" and in-space computing, and said it would also develop "the robotics necessary for complex in-orbit servicing tasks", according to SatNews. D-Orbit's accounts are filed in Italy but were not accessible in free sources for this article.

The record

A robotic joint for a servicing spacecraft due in 2029

The EIC project funded the design of a torque-controlled robotic joint for D-Orbit's GEA servicing spacecraft. GEA's first mission, RISE with ESA, is scheduled for 2029.

  1. 2011D-Orbit foundedFino Mornasco, near Como
  2. Jun 2023EIC Accelerator cut-offASTROLIFTblended finance
  3. Feb 2024Project starts€2.50M EU grant
  4. Oct 2024ESA contract for RISE€119.6M, GEA servicing vehicle
  5. Jan 2025First year endsJoint design, breadboard parts ordered
  6. Jan 2026$53M Series DLed by Azimut Group
  7. Apr 2026Project endsNo final report published
  8. 2029RISE launch plannedGEA in geostationary orbit

CORDIS, D-Orbit, SpaceNews and SatNews.

"In the next project phases, the BBM will be manufactured and then tested."

D-Orbit, first periodic report to the EIC

The Technology: A Robot Arm That Can Feel

Geostationary satellites cost €50 million to €400 million to build and launch and are usually retired when they run out of fuel, the report says. GEA is designed to dock with them and keep them working for up to seven more years. Torque-controlled joints let a robotic arm sense and control the force it applies, which the report says is needed for inspection, capture and servicing. That joint is what ASTROLIFT funds.

The market

Geostationary satellites and their end of life

About 27 new geostationary satellites have been launched a year over the past 20 years, and about 370 will reach end of life between 2026 and 2041, the report says. GEA aims to extend their lives by up to seven years.

D-Orbit, first periodic report (CORDIS). Satellites.

What the EIC Award Promised, and What the Record Shows

The award covered the design, manufacture and testing of a breadboard joint and the design of the arm. At the halfway point the design work was well advanced and parts were on order. Whether the breadboard joint was built and passed its tests is not public. Whether the joint is used on the RISE mission, due in 2029, three years after the EIC project ended, is not public.

  1. Joint and arm requirementsDeliveredPer first report.
  2. Breadboard joint designIn progressJanuary 2025.
  3. Breadboard testsUnverifiedNo final report.
  4. Flight usePendingRISE, 2029.

The Money

The EU grant covered 59% of the project. D-Orbit's ESA contract for RISE is nearly fifty times the size of the grant. Whether the EIC Fund invested under the blended award has not been announced; the Series D reports name Azimut Group as lead.

The funding

The EIC grant against the ESA servicing contract

The EIC grant funds one component of GEA's robotic arm. ESA's RISE contract, signed in October 2024, funds the whole servicing vehicle and mission.

CORDIS and SpaceNews (October 2024). Values in € millions.

The project budget

Who paid for the €4.20M project

The EU grant covered 59% of the ASTROLIFT project's cost.

CORDIS, project 101144903. Values in € millions.

What Cannot Be Checked

Questions for the EIC

Whether the breadboard joint was built and tested, whether the EIC Fund invested, how the EIC-funded work relates to what ESA is paying for under RISE, and D-Orbit's recent accounts are not public.

Why Europe Should Care

Servicing satellites in orbit could save operators the cost of replacing satellites and reduce space debris, the report says. RISE is Europe's first attempt at geostationary life extension. The EIC grant is a small part of that effort, and its specific contribution will only be visible when GEA flies.

What the award promised

A tested torque-controlled robotic joint for an in-orbit servicing arm.

What the record shows

Requirements and design work, parts on order, and no published test results.

The Verdict

A component, out of sight

D-Orbit is growing and has ESA behind its servicing mission. What the EIC grant itself produced is not documented beyond its first year.

D-Orbit and the EIC have not been asked for comment for this article. It is based entirely on public records and published statements, linked throughout.

Industry

SpaceSpace services

Focus
  • In-orbit services
Technologies
  • Robotics
Keywords
  • Satellite life extension
  • Geostationary satellites
  • Space tugs
  • Robotic arms