Efenco and the EIC Accelerator: Plasma Chips That Stayed in the Lab

30 September 20261,011 words6 min

Efenco, an Estonian company co-founded by CEO Kristjan Tiik, Aleksandr Nagornoy and Aleksander Vlassov, developed HERC (High Energy Ray Ceramic), a chip meant to be placed inside industrial boilers. Its EIC application said the "self-powered device" would create plasma during combustion, boosting "burning efficiency by 18%" and lowering greenhouse gas emissions by 20%, with about 50,000 suitable systems in the EU and "105.6M in revenue by the end of 2027", according to CORDIS.

The European Innovation Council granted €2,496,592 towards a €3.57 million project from February 2023 to July 2025; the company announced the award as €10 million of support. The final report states the overall objective was "to reach the first industrial installation of HERC chips". What it describes instead is laboratory work in a custom test rig called the "Fire Cube", showing soft X-ray emission from heated crystals and "up to 5–10% shifts in energy distribution profiles", which it says "lay a robust foundation for industrial pilot deployments post-project".

€2.50MEIC grant, 70% of a €3.57M project
18%Efficiency gain promised
€0Sales revenue in 2024 and 2025 annual reports
1Employee in Q3 2026

Company file

Legal entity
EFENCO OÜ, registry code 12865001, Sillamäe
Registered
12 June 2015
Founders
Kristjan Tiik (CEO), Aleksandr Nagornoy, Aleksander Vlassov
Technology
HERC pyroelectric ceramic chips for plasma-assisted combustion
Staff
1 (Q3 2026), down from 12 (mid-2024)
EIC project
1 Feb 2023 to 31 Jul 2025, closed
EIC funding
Selected for blended finance; CORDIS records a €2.50M grant

Where Efenco Stands Now

Efenco is still registered and showed no tax debts after 22 September 2026, but Estonian tax data compiled by Inforegister show one employee in the third quarter of 2026, after two in the first half of the year and 12 in the second quarter of 2024, an average monthly wage of €650 in early 2026, and no sales revenue in the 2024 or 2025 annual reports (the same data list small quarterly taxable turnover in both years). Its website could not be reached on 6 November 2026, and the latest company news found in sources reviewed dates from 2023. In November 2023 the company announced €4.5 million of funding, made up of €1.3 million led by EstBAN investors and €3.2 million of EIC and Archimedes grants, and said it had six commercial partners, including Adven, Thermory and Bepco, lined up for pilot projects, Tech Funding News reported; it also said it had already delivered 20% savings for a major Tallinn utility. The EIC final report, which covers only the grant project, describes no industrial pilot.

The record

From an 18% claim to a one-person payroll

Efenco promised the first industrial installation of its HERC chips. Its final EIC report describes laboratory experiments instead. Staff fell from 12 in mid-2024 to 1 in the third quarter of 2026.

  1. Jun 2015Company registeredEstonia
  2. 2022Industrial validation18% efficiency gain claimed
  3. Oct 2022EIC Accelerator cut-offHERCblended finance
  4. Feb 2023EIC project starts€3.57M project€2.50M grant
  5. Nov 2023Funding announcedIncluding grants and an equity commitment€4.5M
  6. Jul 2025EIC project endsLab results; pilots put after the project
  7. Q3 2026One employeeNo sales revenue in 2024 or 2025 annual reports

CORDIS, Efenco, Tech Funding News and Inforegister.

"The overall objective of the project is to reach the first industrial installation of HERC chips."

Efenco, final report to the EIC

The Technology: Plasma From Waste Heat

HERC chips contain pyroelectric lithium tantalate crystals in vacuum-sealed ceramic housings. Heated and cooled by the flame, they emit soft X-rays, which Efenco says create low-temperature plasma that changes how fuel burns. The final report records photon rates of up to 2.7 × 10⁷ per square centimetre per second from a 14-chip set-up and calls this "the first experimentally validated instance" of thermally generated high-energy photons affecting combustion.

The claims

Promised efficiency gains against measured effects

The application promised an 18% boost in burning efficiency. The final report cites calorimetric shifts of up to 5% to 10% in energy distribution profiles in laboratory tests; the upper bound is shown.

CORDIS project 190188980, objective and final report.

What the EIC Project Promised, and What CORDIS Shows

The EIC project

The EU contribution covers 70% of a €3.6M project

The HERC project ran from February 2023 to July 2025. CORDIS lists it as closed.

CORDIS project 190188980. Values in € millions.

The project was to take HERC from a 2022 industrial validation to its first industrial installation. The final report does not describe any installation; it reports laboratory science and moves industrial pilots to after the project. It cites the 18% gain only as a 2022 industrial validation result from before the project and reports no new efficiency measurement from the project period. CORDIS lists the project as closed.

  1. First industrial installationNot doneMoved to post-project.
  2. 18% efficiency gainNot shownOnly a 2022 pre-project figure.
  3. Photon emission scienceDeliveredFire Cube tests.
  4. Commercial revenueNone€0 in 2024 and 2025 reports.

The Money

Efenco's annual reports, summarised by Inforegister, show a loss of €667,149 in 2025 after €28,415 in 2024, with equity falling from €1.52 million to €0.85 million. Sources reviewed on 6 November 2026 do not show whether any EIC equity was invested.

The wind-down

Employees by quarter

Number of employees registered for tax each quarter. Efenco's 2024 and 2025 annual reports show no sales revenue.

Inforegister, EFENCO OÜ 12865001, from Estonian Tax and Customs Board data.

What Cannot Be Checked

Questions for the EIC

How much of the grant was paid, whether the EIC Fund invested, why no industrial installation happened within the project and how the EIC assessed the final report against the project's stated objective are not public.

Why Europe Should Care

The report says high-temperature process heat accounts for 24% of global greenhouse gas emissions and that most of these industries lack alternatives. A retrofit chip that cut fuel use by 18% would matter. The EIC funded that promise; the public record shows it did not reach a boiler within the project.

What the project promised

The first industrial installation of HERC chips, cutting fuel use by 18% and emissions by 20%.

What the record shows

Laboratory experiments, pilots deferred, no reported sales revenue and a company down to one employee.

The Verdict

Big claims, small results

Its final report describes laboratory physics, not the industrial installation Efenco set out to deliver. Its report cites the promised 18% gain only as a 2022 result from before the project, not as a project measurement.

Efenco and the EIC have not been asked for comment for this article. It is based entirely on public records and published statements, linked throughout.

Industry

Industrial technologyProcess equipment

Focus
  • Reactors and thermal equipment
Technologies
  • Plasma technology
  • Functional materials
Keywords
  • Industrial boilers
  • Combustion efficiency
  • Industrial decarbonisation
  • Emissions reduction
  • Pyroelectric ceramics