GBM Works and the EIC Accelerator: Quieter Offshore Wind Piles
GBM Works, based in Amsterdam, has developed Vibrojet, a way to install the huge steel monopiles that hold offshore wind turbines without hydraulic impact hammers. Water jets loosen and partly fluidise the soil inside and below the pile while a vibratory hammer does the rest, so that the pile sinks "silent and gentle to target depth under its own weight". The EIC project said current hammering struggles with ever larger turbines and stricter noise rules, according to CORDIS.
The European Innovation Council granted €2,455,635 towards a €3.51 million project, SIMPLER, from May 2023 to December 2025. The report for the first 16 months, the only one on CORDIS, describes a basic design with jetting equipment kept inside the pile and retrieved afterwards, a method to identify suitable wind farm sites, and studies on pumps and clay, with qualification by the certifier DNV planned. In September 2025 GBM Works announced the second close of a €6.2 million seed round with Invest-NL, the EIC Fund and Rotterdamse Havendraken. In April 2026 contractor Van Oord reported installing three monopiles at Ecowende's Hollandse Kust West wind farm with Vibrojet and CAPE Holland's vibro technology, and in August GBM Works and CAPE Holland signed a memorandum of understanding to sell it commercially from 2027.
Company file
- Legal entity
- GBM Works B.V. and GBM Works Holding BV, Amsterdam
- Product
- Vibrojet (FD and FLEX variants)
- Investors
- Invest-NL, EIC Fund, Rotterdamse Havendraken
- First commercial user
- Ecowende, Hollandse Kust West VI
- Partner
- CAPE Holland (Venterra Group), MoU August 2026
- EIC project
- SIMPLER, 1 May 2023 to 31 Dec 2025
- EIC funding
- Blended finance: grant plus EIC Fund equity
Where GBM Works Stands Now
Under the planned partnership, GBM Works handles Vibrojet development, feasibility studies and marketing, while CAPE Holland, which owns vibratory hammers and lifting equipment, handles integration and offshore execution. The two companies plan to formalise it through licence and long-term cooperation agreements; commercial availability from 2027 depends on those being concluded. GBM Works' website says its method is "more than three times faster" and needs no complex noise mitigation, and describes FD and FLEX variants.
The record
Silent monopile installation reaches a real wind farm
GBM Works tested Vibrojet offshore in 2025, installed three monopiles at Hollandse Kust West in 2026 and signed an MoU with CAPE Holland to offer it commercially from 2027.
- Jun 2022EIC Accelerator cut-offVibrojet silent monopile installationblended finance
- May 2023EIC project starts€3.51M project€2.46M grant
- 2025SIMPLE III offshore testIndustry-backed demonstrator
- Sep 2025Seed round closesInvest-NL, EIC Fund, Rotterdamse Havendraken€6.2M
- Dec 2025EIC project endsOnly first report on CORDIS
- Apr 2026First wind farm useThree monopiles, Hollandse Kust West, Ecowende
- Aug 2026CAPE Holland MoUJoint commercialisation from 2027
CORDIS and Windpowernl.
"We let water do the work."
GBM Works, websiteThe Technology: Water Jets and Vibration
Instead of hammering a pile into the seabed, Vibrojet reduces the friction around it: jets inside the hollow pile fluidise the soil and a vibratory hammer overcomes the remaining resistance. The report says a sensor network with AI-based control manages the process and that equipment is recovered after installation. GBM Works also argues that avoiding hammer blows could allow piles to be built with less steel.
The market
The EU offshore wind targets GBM Works cites
Gigawatts of offshore wind capacity targeted by the EU Strategy on Offshore Renewable Energy, as cited in the EIC report.
CORDIS project 190158883, report.
What the EIC Project Promised, and What CORDIS Shows
The EIC project
The EIC grant covers 70% of a €3.5M project
SIMPLER ran from May 2023 to December 2025. CORDIS lists it as closed and shows only the report to August 2024.
CORDIS project 190158883. Values in € millions.
The project aimed to take Vibrojet to detailed design, qualify it with DNV and prepare its market launch. Before September 2025 GBM Works reported a successful offshore test, and the method was used on three real foundations in April 2026. The only CORDIS report, covering the period to August 2024, says DNV issued a feasibility statement and GBM Works submitted a qualification plan; whether qualification was obtained is not public. CORDIS lists the project as closed (checked November 2026).
- Detailed designDeliveredUsed offshore.
- Offshore demonstrationDeliveredSIMPLE III; three monopiles.
- DNV qualificationNot reportedFeasibility statement only.
- Market launchPlannedFrom 2027 with CAPE.
The Money
GBM Works said the seed round, whose second close brought in Invest-NL, would support its first commercial deployment with Ecowende. The EIC Fund's share was not disclosed. Sources reviewed in November 2026 do not show revenue figures.
The money
EIC grant and the seed round
In € millions. The EIC Fund was an investor in the seed round; its share was not disclosed.
CORDIS; Windpowernl, September 2025.
What Cannot Be Checked
Questions for the EIC
How much the EIC Fund invested, whether DNV qualified Vibrojet, how the three Hollandse Kust West installations performed and whether the CAPE licence was signed are not public.
Why Europe Should Care
The report cites EU targets of 60 GW of offshore wind by 2030 and 300 GW by 2050, and notes that nature laws require protecting marine life from noise. A way to install foundations that the company says is quieter and faster goes to the heart of both. The EIC backed it with grant and equity and it has reached a real wind farm.
What the project promised
A qualified, market-ready silent installation method for large offshore monopiles.
What the record shows
A company-reported offshore test, three installed foundations, EIC Fund investment and commercial launch planned for 2027.
The Verdict
Proven offshore, sales next
GBM Works took Vibrojet from design to real foundations within about a year of its EIC project ending. Its commercial future depends on a partnership that is not yet formalised.
GBM Works and the EIC have not been asked for comment for this article. It is based entirely on public records and published statements, linked throughout.
Industry
EnergyWind energy
- Focus
- Offshore wind systems
- Technologies
- Water jetting
- Structural engineering
- Keywords
- Monopiles
- Underwater noise
- Offshore wind
- Pile installation
- Vibratory piling