Hardt and the EIC Accelerator: Hyperloop Test Track, Then Bankruptcy
Hyperloop promised to move pods through low-pressure tubes at airliner speeds, and Hardt was Europe's best-known attempt. The Dutch company, which moved its headquarters to Rotterdam, pitched a European network that would connect cities within hours, starting with freight. With EIC money and investors from the Dutch regions and Korea's POSCO, it built the European Hyperloop Center in Veendam, a 420-metre test tube with a working lane switch.
The European Innovation Council granted €2.5 million towards a €3.68 million project, and the EIC Fund invested in 2023. In September 2025 Hardt's pod reached 85 km/h in the tube and switched lanes at speed. On 4 March 2026 Hardt's group confirmed that a court had declared Hardt BV, one of its operating companies and the EIC beneficiary, bankrupt.
Company file
- Legal entity
- Hardt BV, Rotterdam, Netherlands (VAT NL856708719B01)
- Group
- Hardt Group; Hardt BV is one of its operating companies
- Managing director (2025)
- Roel van de Pas
- Test site
- European Hyperloop Center, Veendam, Groningen
- Investors
- EIC Fund, InnovationQuarter, Investment Fund Groningen, POSCO International, InnoEnergy and others
- EIC project
- Hyperloop for sustainable freight transport, 1 Jan 2022 to 31 Mar 2024
- EIC funding
- Blended finance (grant and equity)
- Status
- Hardt BV bankrupt since 4 March 2026; trustee appointed
What Happened to Hardt
Hardt's statement of 4 March 2026 is short: the court declared Hardt BV bankrupt, a trustee was appointed, and together with the trustee Hardt was "actively exploring all opportunities for continuation of the business activities". It gave no reasons and directed questions to the trustee. According to Railway Gazette, which quotes the trustee's report, "the direct cause of the bankruptcy lies broadly in the failure to be awarded the second part of a so-called 'open commitment' totalling approximately 13 million euros from the European Innovation Council". When that was rejected in early February 2026, "the capital needed to operate Hardt's business had consequently dried up", and private investors became "reluctant to provide additional funds". The same report puts Hardt's losses above €3 million in 2025.
Six months earlier the company had announced a speed record at Veendam: 85 km/h, above the vehicle's design speed of 80 km/h, with acceleration at 0.3G over 140 metres, a lane switch over 155 metres and braking in the final 100 metres.
The test
A 420-metre track, a lane switch, and 85 km/h
Distances in the September 2025 test at the European Hyperloop Center: acceleration, lane switch and braking, on a 420 m track.
Hardt, September 2025.
The Technology: A Pod in a Tube, and a Switch
A hyperloop vehicle levitates magnetically inside a tube from which most of the air has been pumped, reducing friction and drag. Hardt's distinctive contribution was the lane switch, which lets a vehicle move from one tube to another without mechanical points, a precondition for a network rather than a single line. The CORDIS report calls the European Hyperloop Center "the first hyperloop test facility in the world with a fully functional lane-switch".
"Demonstrating lane-switching at these speeds - in this environment - is a major leap from theoretical designs to real-world systems."
Roel van de Pas, managing director, Hardt Hyperloop, September 2025What the EIC Project Promised, and What CORDIS Shows
The EIC project
The EU paid 68% of a €3.68M project
The hyperloop freight project ran from January 2022 to March 2024. The award was blended finance; the EIC Fund invested in 2023.
CORDIS project 190155287. Values in € millions.
The project, which ran from January 2022 to March 2024, set out to develop hyperloop for sustainable freight. Its CORDIS report describes test set-ups and prototypes for magnetic levitation and motors, the start of test-track construction, and plans to build the vehicle in 2023. It gives no freight pilot, customer or speed figures. The test track was completed in April 2024, just after the project ended.
- Sub-system tests and prototypesDeliveredLevitation and motor rigs, per CORDIS.
- A test facility with a lane switchDeliveredCompleted 2024; lane switch at 85 km/h in 2025.
- Freight transport by hyperloopNot achievedNo freight pilot or commercial route.
- Operating company continuesBankruptHardt BV bankrupt in March 2026.
From the Award to Bankruptcy
The record
A test track, a speed record, then bankruptcy
Hardt built what CORDIS calls the first hyperloop test facility in the world with a fully functional lane-switch, but its operating company was declared bankrupt in 2026.
- Jun 2021EIC Accelerator cut-offHyperloop for freight, blended finance
- Jan 2022EIC project startsSub-system tests, test track and vehicle€2.5M grant
- Jul 2023Investment roundEIC Fund, InnovationQuarter, Groningen fund, POSCO International and others€12M
- Mar 2024EIC project endsEuropean Hyperloop Center test track under construction
- Apr 2024Test track complete420 m tube at Veendam with a lane switch
- Sep 2025Speed record85 km/h and a lane switch at speed in the test tube
- Mar 2026BankruptcyCourt declares Hardt BV bankrupt; trustee appointed
CORDIS and Hardt press releases.
The Money
In July 2023 Hardt announced €12 million, combining new and earlier investments, from the EIC Fund, InnovationQuarter, Investment Fund Groningen, First Dutch with Platform Zero, POSCO International and Urban Impact Ventures, to complete the test centre and build the vehicle. The EIC Fund's board member Hermann Hauser was quoted supporting the investment.
What cannot be checked
How much the EIC Fund invested and how much of it has been recovered, why the EIC declined the second part of its open commitment, and whether the test centre and the rest of the group continue are not public.
Why Europe Should Care
Hyperloop attracted European, national and regional public money as a possible low-carbon way to move goods and people. Hardt's test centre in Groningen was built with regional support and is a real piece of engineering. The bankruptcy of its operating company came when the money ran out, after the EIC declined the second part of its open commitment, according to the trustee's report quoted by Railway Gazette.
What the project promised
Hyperloop for smarter, faster, greener transport, starting with freight.
What the record shows
A 420 m test track with a lane switch and an 85 km/h run, then bankruptcy of the operating company.
The Verdict
Engineering progress, no transport business
Hardt built a working test facility and demonstrated a lane switch at speed. But 85 km/h in a 420-metre tube is a long way from freight between cities, and, according to the trustee's report quoted by Railway Gazette, the operating company failed after the EIC declined the second part of its roughly €13 million open commitment and private investors proved reluctant to fill the gap. The EIC's grant and equity paid for real engineering; they did not buy a transport system.
Hardt has not been asked for comment for this article. It is based entirely on public records, company statements and EU project data, linked throughout.
Industry
Mobility and transportRail and guided transport
- Focus
- Maglev and hyperloop
- Technologies
- Magnetic levitation
- Keywords
- Freight transport
- High-speed transport
- Low-pressure tubes
- Lane switching