Ingeobras' EIC Accelerator Wastewater Digester: What It Paid For

7 October 20262,068 words11 min

Food factories produce wastewater so rich in organic matter that most of them either pay for large treatment plants or pay the fines for discharging it. Ingeniería de Obras Zaragoza, a water engineering firm in the Aragonese capital that trades as Ingeobras, set out to sell them something in between: ANAERGY, a compact, modular plant that runs the water through an anaerobic digester, which turns the organic load into biogas, then through aerobic and advanced oxidation stages, all in one system.

The European Commission selected ANAERGY in the EIC SME Instrument Phase 2 cut-off of 9 January 2019. Its list of winners gives the project two rows: Ingeniería de Obras Zaragoza SL and Proyectos y Construcciones Pirineo (Proycon), a manufacturer in Sabiñánigo, Huesca. The grant was €1,224,125 towards a total cost of €1,748,750. Ingeobras, the coordinator, received €975,275 of it, or 79.7%, and Proycon €248,850, according to the CORDIS fact sheet. This article covers Ingeobras; Proycon's part is covered separately.

€975,275Ingeobras' share of the EU grant
€1.22MTotal EU grant for ANAERGY, two companies
95 to 99%Pollutant removal claimed in the project
2Customer sites described in public, both unnamed

Company file

Legal entity
Ingeniería de Obras Zaragoza SL (listed by Empresia as SLP), CIF B99084139
Incorporated
9 December 2005, Zaragoza
Headquarters
Calle Madre Rafols 2, Zaragoza; lab at CEEI Aragón
Leadership
Joaquín Murría Martín, chief executive
Owner
Inngen.io Seed SL, administrator since November 2025
Staff
12 (Empresia); 10 to 49 (Infoempresa)
Revenue
€1M to €2.5M a year (Empresia); under €2M (Infoempresa)
EIC project
ANAERGY, 9 January 2019 cut-off, grant only, CORDIS 858805

Where Ingeobras Stands Now

Ingeobras is active. The Spanish company register entries summarised by Empresia and Infoempresa show it as active, with the latest entry in the official gazette BORME dated July 2026. Empresia gives 12 employees and annual sales between €1 million and €2.5 million; Infoempresa gives 10 to 49 employees and sales under €2 million. Neither shows the filed accounts for free, so profit, equity and the trend in staff since the grant could not be verified.

The ownership has changed. In 2024 the register recorded Joaquín Murría Martín, the chief executive, as sole shareholder. In February 2025 the company widened its corporate purpose to the purchase, sale, import, export and supply of equipment for water treatment plants. In November 2025 a new holding company, Inngen.io Seed SL, founded in October 2025 with €1,886,482 of capital and Murría as sole shareholder, replaced him as sole administrator, according to Empresia's record of the holding. In July 2026 the holding raised its capital by €99,288, ceased to be a single-member company and appointed a board that includes SWALALI SL and a second director. Who the new shareholder is and what it paid are not public.

The website still presents Ingeobras as an engineering firm for water, civil, industrial and structural projects, with an in-house innovation lab called INNGENIO, and it posted news every month from May to September 2026. Those 2026 posts deal with nitrates in drinking water, water supply security, emerging contaminants and hydrogen from wastewater; the August post on nitrates in Europe does not mention ANAERGY or any installed plant.

The record

Two EU grants for one digester, then a turn to nitrates and hydrogen

ANAERGY took Ingeobras through an SME Instrument feasibility study in 2018 and a Phase 2 grant from 2019 to 2021. The company's later public projects deal with hydrogen from wastewater and nitrate removal.

  1. Dec 2005Company incorporatedIngeniería de Obras Zaragoza, Zaragoza
  2. Dec 2016New registered officeMoves to Calle Madre Rafols 2, Zaragoza
  3. Aug 2018Phase 1 feasibility studyANAERGY, four months, with Proycon€50,000
  4. Jan 2019EIC SME Instrument Phase 2 cut-offANAERGY selected, grant only
  5. Jun 2019Phase 2 project startsIngeobras coordinates, Proycon builds the digesters€975,275 to Ingeobras
  6. Dec 2019Technical visitFour ANAERGY test lines shown at the Zaragoza lab
  7. Sep 2021Project endsFinal report: all five milestones worked on, sales strategy changed by COVID-19
  8. Jul 2023Hi2BIO startsHydrogen from industrial wastewater with the University of Zaragoza
  9. Nov 2025Holding companyInngen.io Seed SL becomes sole administrator
  10. Jul 2026Holding opens upCapital increase, board of directors, no longer single-member

CORDIS projects 824952 and 858805; Ingeobras news; Empresia (BORME acts); University of Zaragoza I3A.

The Technology: A Smaller Digester for Food Industry Water

Anaerobic digesters are the standard way to treat wastewater with a high organic load: bacteria break the pollutants down without oxygen and release biogas. The CORDIS summary of the 2018 feasibility study names their limits: they remove only 60 to 80% of the chemical oxygen demand, so an aerobic stage is still needed before discharge; the smallest reactors cost about €300,000; and biogas yields are low. ANAERGY's answer was to integrate the anaerobic, aerobic and advanced oxidation stages in one modular plant, which the project called a first. Ingeobras said its prototype had been tested in four pilot plants, removing up to 99.8% of the chemical oxygen demand, and that the units would sell for €150,000 to €1,500,000 depending on size, according to the Phase 1 fact sheet and its report.

The Phase 2 objective adds that the digester includes PUREMUST, Ingeobras' patented biological process for removing nitrates and sulphates, and that it produces 16 cubic metres of biogas per cubic metre of water, enough to cover about 80% of a plant's energy needs. These are the company's own figures; no independent test of ANAERGY could be found.

"We provide small and medium industries with hi-tech technology that is currently only available for large plants and investments."

Joaquín Murría Martín, chief executive of Ingeobras, to CORDIS Results in Brief, February 2022

What the EIC Project Promised, and What CORDIS Shows

ANAERGY was Ingeobras' second EU grant for the same technology. A four-month SME Instrument Phase 1 study, from August to November 2018, paid the company €50,000; Proycon was listed as a participant without EU money. Ingeobras announced that selection in September 2018. The Phase 1 summary gave the commercial plan in plain numbers: sales from the first quarter of 2021, "starting with 26 units sold going up to 80 in 2024", and accumulated profits of more than €17.9 million over four years.

The grant

Ingeobras took 79.7% of the ANAERGY grant

The EU contribution of €1,224,125 was split between the coordinator Ingeobras and the digester maker Proyectos y Construcciones Pirineo (Proycon).

CORDIS, project 858805, participant list. Values in euros.

The Phase 2 grant agreement was signed on 24 May 2019 and the project ran from 1 June 2019 to 30 September 2021. The division of labour was set out in the objective: Ingeobras would handle technical upgrades, assembly, sales and installation, and Proycon, a partner of 12 years, would build the digesters. The CORDIS results article speaks of "these 24 months", while the dates on the fact sheet span 28; whether the project was extended is not stated. The final periodic report sets the five milestones against what was done.

  1. MS1: upgraded anaerobic digesterDeliveredReported 4,954 ppm of chemical oxygen demand removed in a 4-hour retention time, with the heat exchanger moved inside the digester.
  2. MS2: standard connection modulesDeliveredReported as fully developed, aimed at the leaks of earlier versions.
  3. MS3: test benchDeliveredBuilt and run with several wastewater flows; four test lines were shown at the Zaragoza lab in December 2019.
  4. MS4: industrial mass productionPartlyManufacturing manuals and protocols written; no production volume has been published.
  5. MS5: commercial departmentDeliveredSet up, with the strategy changed by COVID-19; plants reported at a Spanish poultry producer and an Ecuadorian mining company.
  6. 26 units at launch, 80 in 2024 (Phase 1 plan)Not announcedNeither Ingeobras nor any third party has reported a number of ANAERGY units sold.

The technical work was done and reported, and the company says the plant reached customer sites. The CORDIS results article says ANAERGY "has already reached its commercial phase successfully, with its plants being installed in industries across the globe", naming a poultry producer in Spain and a mining company in Ecuador. The company's ANAERGY page gives the same two examples, and a 2023 profile by Go Aragón lists a mining operation in Ecuador among its projects. All three rest on the company's own account; neither customer is named anywhere, and no third party has reported on either plant.

Plan against record

Dozens of units planned, two plant sites described

The 2018 feasibility study planned 26 ANAERGY units in the first sales year and 80 in 2024. The company and CORDIS describe installations at a Spanish poultry producer and an Ecuadorian mining company, without names or a unit count.

CORDIS, project 824952 objective; CORDIS Results in Brief for project 858805; Ingeobras ANAERGY page.

What Ingeobras Has Done Since

After ANAERGY, Ingeobras' public research moved from methane to hydrogen. In July 2023 it began Hi2BIO with the University of Zaragoza's I3A and IA2 institutes, a three-year project funded through NextGenerationEU and Spain's energy agency IDAE to produce hydrogen from industrial wastewater by dark fermentation and photofermentation, according to the university and El Debate. A second project, BIOEnergHII, under the Eureka Eurostars programme with the membrane company UniSieve, aims at a mix of biohydrogen and biomethane from agri-food wastewater, according to Ingeobras. The budgets of both projects and Ingeobras' share could not be found.

The Go Aragón profile of August 2023 quotes Murría saying the company's own prefabricated plants are sold mainly in "Spain and Portugal, Chile and starting in the United States", and credits it with more than 200 turnkey projects in 20 countries, nitrate removal pilots for Madrid's water utility Canal de Isabel II and a Mar Menor pilot that removed 97% of nitrates. In December 2024 Ingeobras received Aragon's RSA 2025 social responsibility seal. No equity round, acquisition or layoff has been reported. ANAERGY was grant only, and Ingeobras does not appear in any public EIC Fund portfolio listing; a search found no record of EIC equity.

The EU money

Ingeobras' share of the two ANAERGY grants

Ingeobras' net EU contribution in each project, against its own total costs in Phase 2. Proycon received nothing in Phase 1 and €248,850 in Phase 2.

CORDIS, projects 824952 and 858805. Values in euros.

What could not be verified

The number of ANAERGY plants sold, the names of its customers, Ingeobras' revenue and profit in any year since 2019, the identity of the investor that entered its holding company in July 2026, and any independent measurement of ANAERGY's performance.

Why Europe Should Care

The agri-food industry, made up chiefly of small and medium-sized firms, is the EU's largest manufacturing sector by employment and value added, the CORDIS results article notes, and its water use is about 1.8% of Europe's total. A plant that cleans that water on a small site and covers part of its own energy fits EU water policy directly. The European Water Resilience Strategy, adopted on 4 June 2025, aims at a "sustainable, resilient, smart and competitive water-economy" and records that only 37% of EU surface water bodies have good ecological status. The ANAERGY report itself tied the project to the Green Deal's pollution and sustainable industry goals. Whether a dozen-person firm can supply that market at scale is the open question the record does not answer.

What the company said

A first-of-its-kind compact plant, 26 units sold in its first year rising to 80 in 2024, more than €17.9 million in accumulated profits and a payback early in the second year.

What the record shows

All five project milestones reported, two unnamed customer sites, no published sales count, and a company with about a dozen staff and €1 million to €2.5 million in sales today, with no public figures for earlier years.

The Verdict

Built, sold, not scaled

The EIC paid Ingeobras close to €1 million to industrialise ANAERGY, and the project did what a development grant should: a better digester, a test bench, production protocols and, by the company's account, plants at two customers. What it did not produce is evidence of the business case. The unit sales forecast in 2018 have never been reported, the register data show a firm of about a dozen staff with no public sign of growth, and its public work has moved to nitrates and hydrogen. ANAERGY looks like one product in an engineering firm's catalogue, not the growth engine the application described.

Ingeobras has not been asked for comment for this article. It is based entirely on public records, company statements and EU project data, linked throughout.

Industry

Climate and environmentWater management

Focus
  • Water treatment
Technologies
  • Anaerobic digestion
Keywords
  • Food industry wastewater
  • Biogas
  • Compact treatment plants
  • Chemical oxygen demand