Magneto, a 2018 spin-off of Delft University of Technology, develops magnetocaloric heat exchangers: 3D-printed parts made of a rare-earth-free alloy that warms when magnetised and cools when the field is removed, so a heat pump can move heat using water instead of refrigerant gases. It was selected in the EIC Accelerator's March 2023 cut-off and received an EU grant of €2.50 million for a €3.59 million project that runs from December 2023 to November 2026, according to CORDIS. The objective promised to widen the temperature range and "run first pilots in commercial cooling sector by 2025".

The only public report, to November 2024, says Magneto built a library of materials covering -20 to +50°C and achieved stable production of printed heat exchangers with fibres thinner than 250 microns, according to the CORDIS reporting page. It says its material uses no rare earths, reuses a steel-industry waste product and costs as little as €3 per kilogram. Sources reviewed on 7 November 2026 do not show a pilot with a heat pump maker or commercial cooling customer. The project is scheduled to end on 30 November 2026.

€2.50MEU grant
€3/kgMaterial cost, claimed
-20 to 50°CMaterial library range, 2024
NoneCommercial pilots found, Nov 2026

Company file

Legal entity
Magneto B.V., Delft
Managing director
Ivo Dusek
Location
YES!Delft incubator
Origin
TU Delft research on magnetocaloric materials
Target markets
HVAC, commercial cooling, data centres
Other grants
Eurostars (€500,000), NWO, EIT Climate-KIC
EIC funding
Grant first

Where Magneto Stands Now

Magneto is based at the YES!Delft incubator. Its history page lists a series of public grants, from a €40,000 feasibility study with TU Delft to the EIC award, and it won a €500,000 Eurostars grant in 2023, according to Catalyze, the consultancy that prepared both applications. Its history page also lists a €1 million round from UNIIQ (Delft Enterprises), SHIFT Invest, the Graduate Entrepreneur Fund and Rabobank, announced in July 2022 according to Silicon Canals; sources reviewed on 7 November 2026 show no later round. Its revenue and staff numbers are not public, and the objective's target of €85 million of revenue by 2029 has no public milestones behind it yet.

The record

From TU Delft feasibility study to EIC project

Magneto's EIC project runs until November 2026. Sources reviewed on 7 November 2026 do not show the commercial cooling pilots it planned for 2025.

  1. 2018Magneto foundedSpin-off of TU Delft
  2. Jul 2022Investor round€1M from UNIIQ, SHIFT Invest, GEF, Rabobank
  3. 2023Eurostars grant€500,000
  4. Mar 2023EIC Accelerator cut-offMagnetocaloric heating and coolinggrant first
  5. Dec 2023Project starts€2.50M EU grant
  6. Nov 2024First period endsMaterial library -20 to +50°C, 3D-printed exchangers
  7. 2025Commercial cooling pilots plannedNone in sources reviewed
  8. Nov 2026Project endsScheduled

CORDIS, Magneto, Catalyze and Silicon Canals.

"If we succeed in our mission, we will revolutionize the way humanity generates heating and cooling."

Magneto, first periodic report to the EIC

The Technology: Heat Moved by Magnetism

Most heat pumps and fridges compress a refrigerant gas; the most efficient gases have been phased out for their climate impact, and replacements are less efficient, the report says. Magnetocaloric heat pumps have worked in laboratories for years but depended on costly rare-earth materials with narrow temperature ranges. Magneto claims its devices can be up to 30% more efficient than vapour compressors. Sources reviewed do not show a magnetocaloric heat pump using its exchangers working at commercial scale.

The temperature range

Temperature span: achieved material library against claimed range

By late 2024 Magneto's material library covered 70 degrees, from -20 to +50°C. It says its heat exchangers can work from -80 to +200°C, a 280-degree range not yet shown in a product.

Magneto, first periodic report (CORDIS). Degrees Celsius of span.

What the EIC Award Promises, and What the Record Shows So Far

The project is still running, so final judgement must wait. In the report to November 2024 the materials and heat exchangers had advanced. Sources reviewed on 7 November 2026 do not show the 2025 commercial cooling pilots named in the objective, or the validation with heat pump manufacturers that the report names as the project's focus.

  1. Material libraryDelivered-20 to +50°C, 2024.
  2. Printed heat exchangersDeliveredUnder 250-micron fibres.
  3. Commercial pilots by 2025Not foundNone in sources reviewed.
  4. Manufacturer validationUnverifiedProject runs to Nov 2026.

The Money

The EU contribution equals 70% of the project's recorded cost. On the company's own list, public grants and a €1 million investor round in 2022 have carried Magneto from feasibility study to prototype. The EIC grant alone is larger than all its earlier listed grants together. Building heat pumps or supplying manufacturers at scale would take more capital than the funding it has announced.

The public money

Grants listed by Magneto

Grants only: Magneto also lists a €1 million investor round in 2022, not shown. The EIC award is larger than all its earlier grants combined.

Magneto history page, Catalyze and CORDIS. Values in € thousands.

The project budget

Who pays for the €3.59M project

The EU contribution equals 70% of the project's recorded total cost.

CORDIS, project 190180830. Values in € millions.

What Cannot Be Checked

Questions for the EIC

Whether any pilot with a heat pump maker or cooling customer has started, what efficiency Magneto's prototypes reach, and whether it has raised private money since 2022 are not public.

Why Europe Should Care

Heating and cooling use more electricity than any other application, the report says, and demand from data centres is growing. A refrigerant-free heat pump without rare earths would help Europe cut emissions and dependence on imported materials. Magneto has the materials science; the proof in a working product is still to come.

What the award promised

A wider temperature range and first commercial cooling pilots by 2025.

What the record shows

A material library and printed exchangers, no pilots in sources reviewed, project still running.

The Verdict

Too early to judge

Magneto's EIC project ends in November 2026. The pilots it planned for 2025 do not appear in sources reviewed, and the final report will show whether it caught up.

Magneto and the EIC have not been asked for comment for this article. It is based entirely on public records and published statements, linked throughout.

Industry

EnergyHeating and cooling

Focus
  • Heat pumps
Technologies
  • Thermal engineering
  • 3D printing
Keywords
  • Refrigerant-free cooling
  • Rare-earth-free materials
  • Data centre cooling
  • Commercial cooling