Nova Innovation and the EIC Accelerator: Tidal Power Scaled Back
Nova Innovation, founded in Edinburgh in 2009, installed one of the first offshore tidal energy arrays, in Bluemull Sound in Shetland. By January 2023 the array had six 100 kW turbines on the seabed, turned by the tide, according to Wikipedia's account of the company.
In the October 2021 cut-off Nova was selected for a €2.5 million EIC Accelerator grant for UpTEMPO, a two-year project to design, build and demonstrate a 200 kW turbine with blade pitch control that would "reduce tidal energy costs by 30%". On the EIC's account, that grant was never signed. In a note of 15 September 2022 on the contracts from that cut-off, the European Innovation Council wrote that "Five grant-only projects with United Kingdom beneficiaries have been rejected as Horizon Europe association agreement have not been signed." Nova is one of exactly five UK companies selected for grant-only awards at that cut-off, no UpTEMPO project appears in CORDIS, and there is no report that the 200 kW turbine was installed. Nova's accounts at Companies House show that in 2024 it wrote down £11.8 million of intangible assets, "some of the early technology in tidal energy", and that its staff fell from 39 in 2023 to 28 in 2025.
Company file
- Legal entity
- Nova Innovation Ltd, SC358996, Edinburgh
- Founded
- 1 May 2009
- CEO
- Simon Forrest, co-founder
- Businesses
- Tidal turbines, floating solar, marine services
- Investor
- Scottish National Investment Bank (from 2021), per company
- EU tidal project
- SEASTAR, 4 MW array at EMEC, Orkney
- EIC award
- UpTEMPO, October 2021 cut-off, grant only; the EIC reported all five UK grant-only projects from that cut-off rejected
Where Nova Innovation Stands Today
Nova's news page is now mostly about floating solar: Scotland's first floating solar array at the Forth Ports headquarters in Leith in 2023, the AquaGen365 joint venture with the consultancy RSK in 2024, a contract in December 2025 for a floating solar array at a quarry in Cheshire and, in June 2026, an announcement that it was powering a UK quarry. Its about page now lists "Floating Solar, Electrification, Marine Services". In its 2024 accounts the directors wrote that "delays in getting consent, along with the choke point of grid-access, have seen tidal projects face delays" and that Nova had offset them "with the addition of floating solar". The company appointed a new chair in December 2025 and allotted new shares in August 2026.
The team
Staff peaked in 2023 and have fallen since
Average number of employees in each accounting period, as filed. The 2022 period ran 16 months, from September 2021 to December 2022.
Companies House, Nova Innovation Ltd accounts.
The Technology: Turbines on the Seabed
Nova's turbines sit on gravity foundations on the seabed and turn with tidal currents, which run on a predictable timetable. The UpTEMPO turbine was to add blade pitch control, to capture more energy, and a more compact body to cut weight and cost, meeting the EU's target of €150 per MWh for tidal energy by 2025. Nova's next array, SEASTAR, is a 4 MW, 16-turbine project at the European Marine Energy Centre in Orkney, backed by Horizon Europe and announced in November 2023. The project's own documents, summarised by Tethys, say it will be "installed and commissioned in a single phase in 2027/28".
"Tidal energy is needed for our future renewable energy mix – it is clean, reliable, predictable and has no visual impact."
Simon Forrest, CEO of Nova Innovation, on the EIC awardWhat the EIC Project Promised, and What the Record Shows
The money
An £11.8M write-down in 2024
Net assets at each balance sheet date. The fall in 2024 reflects an £11.8 million impairment of intangible assets, mainly early tidal technology.
Companies House, Nova Innovation Ltd accounts. Values in £ millions.
UpTEMPO promised a 200 kW turbine demonstrated within two years, cutting the cost of tidal energy by 30%. There are no project results to weigh against that, because on the EIC's own account the grant was rejected and no agreement was signed, which is also why no UpTEMPO record exists in CORDIS. UK Research and Innovation ran a Horizon Europe guarantee for applicants unable to receive their Horizon Europe funding while the UK was in the process of associating, which covered EIC Accelerator awards; whether Nova claimed it is not public. Nova has not announced the turbine's deployment, and SEASTAR, its next array and a genuinely Horizon Europe-backed one announced after the UK agreed association in September 2023, has not been installed. The 2024 accounts say the company "impaired some of the value of some of the early technology in tidal energy that has now been superseded", writing off assets with a cost of £4.8 million in full and part of assets worth £7.9 million.
- A 200 kW pitch-controlled turbineNot shownNo deployment announced.
- 30% lower tidal energy costNot shownNo results published.
- A larger tidal arrayNot yetSEASTAR set for 2027/28.
- Company growthMissedStaff down to 28.
- The EIC grant itselfRejectedUK association unsigned, per the EIC.
What Has Happened Since the Award
The record
From tidal pioneer to floating solar
Nova was selected for EIC money for a bigger tidal turbine in 2021, but the EIC reported in September 2022 that all five UK grant-only projects from that cut-off had been rejected; by 2024 it had written down early tidal technology and added floating solar, while its big EU tidal array is scheduled for 2027/28.
- May 2009FoundedNova Innovation Ltd, Edinburgh
- Dec 2021EIC grant announcedUpTEMPO: an upscaled 200 kW tidal turbine€2.5M
- Sep 2022UK grant-only projects rejectedThe EIC reports five grant-only projects with UK beneficiaries rejected, the association agreement being unsigned
- Jan 2023Shetland arraySix 100 kW turbines in Bluemull Sound
- Nov 2023SEASTAREU-funded 4 MW, 16-turbine array planned for Orkney
- Nov 2023First floating solarForth Ports headquarters in Leith
- Jun 2024AquaGen365Floating solar joint venture with RSK
- 2024ImpairmentEarly tidal technology written down£11.8M
- Dec 2025Quarry contractFloating solar array in Cheshire
Nova Innovation, Companies House filings (SC358996), EMEC and Tethys.
The Money
Nova's filed accounts show net assets of £22.0 million at the end of 2023, falling to £12.4 million a year later after the impairment, and £13.2 million at the end of 2025; cash was £1.4 million at the end of 2025. The directors prepared the accounts on a going-concern basis, citing forecast "positive operational cash flow for at least the next 12 months". The company names the Scottish National Investment Bank as an institutional investor since 2021. None of that money came from the UpTEMPO grant, which the EIC rejected before any agreement was signed, and which is why the project appears nowhere in EU project data.
What cannot be checked
Whether the 200 kW UpTEMPO turbine was built or tested, whether Nova claimed replacement funding from the UK guarantee scheme, and how much of its revenue now comes from tidal rather than floating solar are not public.
Why Europe Should Care
The EIC chose Nova to push tidal energy towards commercial cost and then rejected the grant, so the push was never paid for from Brussels. Nova's own accounts describe consent and grid delays holding tidal projects back, and the company has turned partly to floating solar to fill the gap. Europe's tidal ambitions now rest on SEASTAR, which is still to be installed.
What the project promised
A 200 kW turbine that cuts the cost of tidal energy by 30%, demonstrated within two years.
What the record shows
A rejected grant, no reported deployment, an £11.8M tidal write-down, a shrinking team and a move into floating solar.
The Verdict
A tidal bet, partly hedged
UpTEMPO received no EU grant on the EIC's account: the EIC rejected the grant because the UK's association agreement was unsigned, and the 200 kW turbine has not been reported built. Nova has written down early tidal technology, shed staff and moved into floating solar, while its large EU-backed tidal array waits for 2027/28.
Nova Innovation has not been asked for comment for this article. The reporting is based on publicly available sources, including company statements, UK company filings, project documents and official European Innovation Council documentation.
Sources
- Marine Energy Wales, Nova wins €2.5M EIC grant for UpTEMPO
- Companies House, Nova Innovation Ltd filing history and accounts
- EMEC, SEASTAR announcement, November 2023 and Tethys, SEASTAR project site
- Nova Innovation, news and about us
- Wikipedia, Nova Innovation
- European Innovation Council, 100th Accelerator grant agreement, 15 September 2022
- UK Research and Innovation, Horizon Europe guarantee funding
Industry
EnergyMarine energy
AlsoEnergySolar energy
- Focus
- Tidal energy
- Solar applications
- Technologies
- Turbomachinery
- Keywords
- Marine renewables
- Predictable renewable power
- Quarries
- Island grids
- Hydrokinetic turbines