Re-Match's EIC Accelerator Turf Yarn Worked; Its Plants Closed

15 October 20262,397 words12 min

Every artificial football pitch wears out, and when it does, its plastic fibre, rubber granules, sand and backing have to go somewhere. Re-Match, a company from Herning in Denmark, built a dry mechanical process to pull worn-out turf apart into those four materials. In the EIC Accelerator pilot's Green Deal round of May 2020 it won a grant of €2,499,000 for CREATE, a project to make new turf yarn from the plastic fibre of old pitches, according to CORDIS. The European Commission's list of selected companies names Re-Match of Herning as the only beneficiary of CREATE, with a grant-only award.

The project worked. Its final report says Re-Match and its partners were producing yarn with 50% recycled content by 1 March 2024, and the turf maker Edel Grass sold it as Edel Athmos. The business did not. Re-Match's plants in Denmark, the Netherlands and France entered restructuring, bankruptcy or liquidation between December 2024 and April 2025, and the company that signed the EU grant agreement now exists only to hold patents, according to its 2024 annual report and its 2025 annual report.

€2.499MEU grant for CREATE, 2020
50%Recycled content of the new turf yarn, March 2024
DKK 770MGroup net losses, 2020 to 2024
3 of 3Plants in restructuring, bankruptcy or liquidation by April 2025

Company file

Grant holder
CVR 35465529, signed as RE-Match A/S, renamed RE-Match Holding A/S on 31 December 2020 and RE-Match Holding ApS in July 2026
Operating company
Re-Match A/S, CVR 41983426, Herning, founded December 2020, renamed Ialwfan 2024 A/S in restructuring
Seat
Sundkrogsgade 21, Copenhagen; formerly HI-Park 415, Herning
Chief executive
Jon Andre Løkke (2025 accounts); director Drilon Ferizaj from July 2026
Owners
Project Astro Bidco A/S since 2023, owned by funds of Verdane and Nordic Alpha Partners and shareholders who swapped into it
Plants
Herning (Denmark), Tiel (Netherlands), Erstein (France); all closed
Staff
109 on average in 2024; none budgeted for 2025
EU funding
RE-MATCH, SME Instrument Phase 1, 2018 to 2019; CREATE, EIC Accelerator pilot, May 2020, grant only

What Is Left of Re-Match

The grant holder, CVR 35465529, is still registered. Its accounts for 2025 show a loss of DKK 17.7 million, cash of DKK 295,000 and negative equity of DKK 210.3 million; DKK 179.3 million of its DKK 211.3 million of debt is owed to other companies in its group. Management writes that the company "has not yet been able to secure investors that are willing to license the technology/IP rights", that "all employees are laid off" and that the 2026 budget only keeps the company alive "to secure IP rights". The auditor, PwC, flagged a material uncertainty about whether it can continue as a going concern, according to the 2025 annual report. In July 2026 it converted from a public to a private limited company and appointed a new director, according to North Data.

"Three plants were built to prove the methodology, and only because fair and ready market conditions were not present, all three had to close again."

Re-Match Holding A/S, notes to the 2025 annual report, June 2026

Re-Match's operations are therefore closed, although no insolvency proceedings have been opened against the grant holder itself. Its old Danish domain, re-match.dk, now carries a generic text on turf recycling next to links to online casinos, as a visit on 15 October 2026 showed.

The record

From a Herning pilot plant to an IP holder in seven years

Re-Match won two EU grants, listed on First North, built three plants and was taken private. By April 2025 all three plants were in restructuring or bankruptcy.

  1. Dec 2018SME Instrument Phase 1RE-MATCH feasibility study, €50,000
  2. May 2020EIC Accelerator pilot cut-offCREATE, Green Deal callgrant only
  3. Oct 2020CREATE starts€2.499M EU grant
  4. Dec 2020Group restructuredGrantee renamed RE-Match Holding A/S; new Re-Match A/S runs Herning
  5. Dec 2021First North listingDKK 175M gross proceeds
  6. Dec 2022Tiel plant processes first turfNetherlands, €4.5M Dutch grant
  7. May 2023Taken privateVerdane and Nordic Alpha Partners, DKK 7 a share
  8. Mar 2024CREATE endsYarn with 50% recycled content
  9. Mar 2024Erstein plant opensFrance, joint venture
  10. Dec 2024Herning plant in restructuringHerning bankruptcy courtrestructuring
  11. Feb 2025Dutch subsidiary bankruptGelderland courtbankrupt
  12. Apr 2025French joint venture liquidatedStrasbourg courtliquidation
  13. Jun 20262025 accountsNo operations, negative equity DKK 210M

CORDIS, EC winner list, company announcements, Danish annual reports, North Data, faillissementsdossier.nl and BODACC.

The Technology: Dry Separation, Then Yarn

A pitch at the end of its life is a carpet of polyethylene fibres tufted into a backing, filled with sand and rubber granules. Re-Match cuts the turf down, dries and cleans it, and separates it "without using water" into sand, backing, rubber and plastic fibre, as the European Circular Economy Stakeholder Platform describes it. The alternatives the company cited were landfill and incineration, according to its Phase 1 report.

Sand and rubber were easy to sell on. The plastic fibre was not: CORDIS records that before CREATE, yarn from the recycled fibre was "not feasible due to contamination with at least three different non-polyolefin-based products". The original plan was to dissolve the fibre into a new resin with the CreaSolv process, which the Fraunhofer Institute patented. Tests in 2021 worked, but a feasibility study found a full-scale plant too expensive. In 2023 Re-Match developed its own Fine-Dust-Cleaning system instead and used it to make yarn with 50% recycled content at what the report calls a profitable price at market rates for virgin material.

That yarn went into a real product. Edel Grass sold Edel Athmos, a dual-component fibre with a recycled core and a virgin polyethylene sheath, and said "half of the yarn is made of reclaimed materials", with Re-Match as the supplier under an exclusive agreement with the Victoria Grass Group, according to Sportsfields.info in April 2024. Edel's case study of a pitch at Ribblesdale High School in England says "the recycling technology behind this innovation comes from Re-Match". A later Edel project page, dated 2 December 2025, says the "cleaning and recycling technology used came to a halt in early 2025".

What CREATE Promised, and What the Record Shows

The project budget

The EU paid 70% of the €3.57M CREATE project

CREATE ran from 1 October 2020 to 31 March 2024 under the EIC Accelerator pilot's Green Deal call.

CORDIS, project 101009316. Values in € millions.

CREATE followed a €50,000 Phase 1 feasibility study, also called RE-MATCH, which ran from December 2018 to March 2019 and planned a pilot plant for resin from turf fibre, according to CORDIS. The Phase 2 project ran for 42 months, from 1 October 2020 to 31 March 2024. Its objective was new turf yarn "of similar quality to the originals" made from dissolved fibre, and, over five years, "accumulating profits of €20M and creation of additional 22 FTEs exclusively from the EIC Accelerator project".

  1. New turf yarn from recycled fibreDelivered50% recycled content by March 2024, per CORDIS; sold as Edel Athmos.
  2. Resin from dissolved fibre (CreaSolv)DroppedJudged too expensive at full scale; replaced by a cleaning process.
  3. Four full-size test pitches with VictoriaNot shownOne installed by project end; the other three, due in summer 2024, never reported.
  4. ISO 9001, ISO 14001, EuCertPlast, ISCC+DeliveredListed in the final report.
  5. €20M profit and 22 jobs in five yearsNot achievedGroup losses of DKK 542M in 2023 and 2024; all staff laid off.

The technical goal was met, by a different route than planned and with half rather than all of the fibre recycled. The commercial goal was not: by the time the yarn reached pitches, the plants that were to supply the recycled fibre were losing money, and within a year of the project's end the supply had stopped.

The Growth Plan and the Collapse

Re-Match listed on Nasdaq First North Premier Growth Market in December 2021, raising gross proceeds of DKK 175 million, according to its legal adviser DLA Piper. Its 2021 annual report promised "24 operational factories in 10 years", with the next ones in the Netherlands, Pennsylvania and France. The Dutch plant in Tiel processed its first turf in December 2022, backed by a €4.5 million grant from the Dutch government, and the French plant was "fully funded", including €2.3 million from the Grand Est Region and ADEME, the company said when it published its 2022 results. High energy prices cut the Herning plant to a minimum from November 2022 to April 2023, according to a company announcement.

In March 2023 Project Astro Bidco A/S offered DKK 7 a share for the company, on behalf of funds managed by Verdane and Nordic Alpha Partners, with irrevocable undertakings for about 73% of the shares, according to the offer announcement. By May 2023 the offeror held more than 90%, applied to delist the shares and began a compulsory buy-out of the minority, according to a later announcement. North Data records Project Astro Bidco as the shareholder from June 2023.

The losses

Group net loss by year, 2020 to 2024

The group lost DKK 770 million in five years. The 2024 figure includes impairments of DKK 327 million as the plants failed; the auditor disclaimed an opinion on those accounts.

Re-Match Holding A/S annual report 2024, five-year financial highlights. Values in DKK millions.

The third plant, a joint venture near Strasbourg, opened in March 2024. The 2024 annual report says "the main issue was securing sufficient feedstock and selling off the cleaned materials". The group budgeted an EBITDA loss of €4.6 million for 2024, after €13 million in 2023, missed it, and lost DKK 439.8 million, ending the year with negative equity of DKK 467.4 million. PwC disclaimed an opinion on those accounts because it "had not had access to financial information".

How the three plants ended

Herning: the bankruptcy court in Herning opened restructuring proceedings for Re-Match A/S, renamed Ialwfan 2024 A/S, on 20 December 2024, according to North Data; the 2024 report says control passed to an administrator. How the restructuring ended could not be verified. Tiel: Re-Match Netherlands B.V. was declared bankrupt on 3 February 2025 according to faillissementsdossier.nl, which lists auctions of the recycling line in April and May 2025; Greeninside dates the ruling 4 February. Erstein: the Strasbourg court opened receivership for Re-Match France on 3 March 2025 and converted it to liquidation on 14 April 2025, according to BODACC. The group put its stake in the French venture at 40% in its 2021 accounts and at 60% in its 2024 accounts.

The team

Average staff tripled before the collapse

Group headcount rose from 34 to 109 as the Tiel and Erstein plants came on stream. For 2025 the company budgeted no employees at all.

Re-Match Holding A/S annual report 2024, five-year financial highlights.

What Cannot Be Checked

We found no public record of any EU recovery claim on the €2,499,000 grant; CREATE ended nine months before the first plant entered restructuring. The 2025 accounts still carry DKK 29.97 million of deferred income from government grants for the Tiel plant and the recycling method, which management decided "to maintain" as obligations. Re-Match is not in the EIC Fund portfolio, which is consistent with its grant-only award; all 16 pages of the list were searched for this article. Whether the Pennsylvania plant, for which the 2021 report mentions a grant opportunity, was ever built is not stated; the 2024 report wrote off the US subsidiary's assets.

Why Europe Should Care

On 25 September 2023 the Commission restricted intentionally added microplastics and named "the granular infill material used on artificial sport surfaces" as "the largest source of intentional microplastics in the environment", according to its announcement, also published by the EU delegation to Japan. CORDIS lists CREATE under the EIC Accelerator pilot's Green Deal topic, and a European recycler of worn-out pitches is the kind of circular-economy supplier that topic set out to fund.

The market Re-Match tried to enter is now under investigation. In May 2026 the Commission sent statements of objections to Sport Group, Oranjewoud, TenCate Grass, Sports & Leisure Group and Domo Sports Grass Nederland, alleging that they agreed not to compete with their own Dutch turf recycler, GBN-AGR, used it exclusively and fixed the gate fee for recycling old turf in Germany between 2020 and 2023, according to EUWID and Sportsfields.info. The objections are preliminary and do not prejudge the outcome. Re-Match is not named in them, but its 2025 report says the value of licensing its patents depends "in part" on the outcome of that investigation, and the 2024 report names securing enough worn-out turf to process as its main problem.

What the company said

A full cradle-to-cradle loop for artificial turf, €20 million in profit and 22 new jobs from the EIC project, and 24 factories worldwide within ten years.

What the record shows

A working yarn with 50% recycled content, sold by a major turf maker. Three plants built, all in restructuring, bankruptcy or liquidation by April 2025, DKK 770 million of losses and a grantee with patents but no staff.

The Verdict

The technology outlasted the company

CREATE did what an EIC grant is meant to do: it solved the contamination problem that kept old turf fibre out of new yarn, and the result reached pitches. Re-Match could not turn that into a business. It scaled to three plants on public grants, a stock listing and private equity and its 2024 report names securing enough turf to feed them as the main issue; all three plants were in restructuring, bankruptcy or liquidation within a year of the project's end. Its patents are for sale or licence; no buyer has been found.

Re-Match, its owners and the EIC have not been asked for comment for this article. It is based entirely on public records, company statements and EU project data, linked throughout.

Industry

Climate and environmentRecycling

Focus
  • Plastic recycling
Technologies
  • Mechanical recycling
Keywords
  • Artificial turf
  • Synthetic yarn
  • Microplastics
  • Sports pitches