Sakowin and the EIC Accelerator: Plasma Hydrogen, Then Liquidation
Sakowin, founded in 2017 in Provence, set out to make hydrogen from natural gas without releasing carbon dioxide. It used microwave plasma to split methane into hydrogen and solid carbon, so that the carbon ends up as a powder that can be used in cement or construction rather than in the air.
The European Innovation Council granted €2,500,000 towards South Beach, a €5.44 million project that ran from October 2022 to June 2025, and in January 2024 the EIC Fund invested €1.2 million in a €4 million round. According to the CORDIS report, "the first South Beach 100 kW Demonstrator was built and shipped to an industrial user". On 2 April 2026 a court opened receivership, fixing 24 March as the date Sakowin stopped paying its debts, and on 15 June 2026 it ordered liquidation, according to the official gazette notices.
Company file
- Legal entity
- Sakowin SAS, SIREN 824 658 769
- Founded
- 2 January 2017
- Founder and president
- Gérard Gatt
- Technology
- Microwave plasma decomposition of methane into hydrogen and solid carbon
- Investors
- Vol-V, EIC Fund, management (2024 round); Saint-Gobain, Ponticelli, Groupe ADF, AES Dana (2021 round)
- EIC project
- South Beach, 1 Oct 2022 to 30 Jun 2025, closed
- Insolvency
- Payments stopped 24 Mar 2026; receivership 2 Apr; liquidation 15 Jun 2026
What Happened to Sakowin
The French official gazette, BODACC, records that the Fréjus commercial court opened receivership (redressement judiciaire) on 2 April 2026 and converted it into judicial liquidation on 15 June 2026, appointing a liquidator in Grasse. Pappers also lists a register entry that the company's equity had fallen below half its share capital. Sources reviewed on 4 November 2026 do not show a buyer for the technology. In January 2024, when it raised €4 million, Sakowin had said it aimed to commercialise a standardised 100 kW module by the end of 2025.
The record
A demonstrator shipped, then receivership and liquidation
Sakowin shipped its first 100 kW hydrogen demonstrator during the EIC project. Nine months after the project ended it stopped paying its debts.
- Jan 2017Company foundedSakowin, Provence
- Mar 2022EIC Accelerator cut-offSouth Beach: hydrogen from methane by microwave plasma
- Oct 2022EIC project starts6 kW unit, then 100 kW prototypes€2.50M grant
- Jan 2024Funding roundVol-V €2.5M, EIC Fund €1.2M, management €0.3M€4M
- Jun 2025EIC project endsFirst 100 kW demonstrator shipped to an industrial user
- Mar 2026Payments stopCourt-fixed date of cessation of payments: 24 March
- Apr 2026ReceivershipRedressement judiciaire opened on 2 April
- Jun 2026LiquidationJudicial liquidation ordered on 15 June
Presse Agence, CORDIS and BODACC.
The Technology: Splitting Methane With Microwaves
The CORDIS report describes the reaction "CH4 ➨ C + 2 H2" driven by microwave plasma at atmospheric pressure, a 6 kW laboratory unit, an industrial test bed, a 100 kW Alpha prototype with carbon recovery and a certified 100 kW Beta demonstrator. The shipped demonstrator was to supply hydrogen on site for an industrial enamelling oven, with the carbon recovered for cement and construction uses. The report presents the process as "an efficient alternative" to steam reforming, electrolysis and other pyrolysis methods; no efficiency or cost figures are given.
"L'EIC Fund est devenu un investisseur majeur dans les deeptechs européennes."
Svetoslava Georgieva, chair of the EIC Fund board, on the Sakowin investment, January 2024What the EIC Project Promised, and What CORDIS Shows
The EIC project
The EU contribution covered 46% of a €5.44M project
South Beach ran from October 2022 to June 2025. The award was blended finance.
CORDIS project 190188862. Values in € millions.
South Beach promised "CO2-free, on-demand, on-site production of low-cost green hydrogen". It delivered plasma models, prototypes and one shipped demonstrator. It did not report hydrogen output, running hours or cost per kilogram, and its final report listed "finding adequate financial resources to facilitate the implementation of South Beach" among the key enablers beyond the EIC funding. Sources reviewed on 4 November 2026 show no financing round after January 2024.
- 100 kW demonstratorDeliveredBuilt and shipped.
- Low-cost hydrogen shownNot shownNo cost data.
- Commercial module by end 2025MissedNot announced in sources reviewed.
- A viable companyFailedLiquidated June 2026.
The Last Round
The January 2024 round brought €2.5 million from Vol-V, €1.2 million from the EIC Fund and €300,000 from management, to launch an optimisation programme with ten industrial partners. A 2021 round had brought in four industrial investors: Saint-Gobain, Ponticelli, Groupe ADF and AES Dana. Twenty-six months later the company was insolvent.
The last round
The EIC Fund put in €1.2 million in 2024
The January 2024 round of €4 million by investor, in € millions.
Presse Agence, 30 January 2024.
The Money
Sakowin's net losses recorded by Pappers rose from €0.84 million in 2022 to €1.60 million in 2023 and €2.14 million in 2024. The official company directory confirms the 2024 net loss of €2,141,724. Sources reviewed on 4 November 2026 show no new round before the company stopped paying its debts in March 2026.
The accounts
Losses grew every year
Net result in millions of euros.
French company register via Pappers.
What cannot be checked
How the demonstrator performed, what the EIC Fund will recover from its €1.2 million, and whether any buyer will take over the technology are not public.
Why Europe Should Care
The EIC funded Sakowin with a grant and with equity, and the company reached a working 100 kW demonstrator. It failed nine months after the project ended, before the commercial module it had promised.
What the project promised
CO2-free, on-demand, on-site production of low-cost green hydrogen.
What the record shows
One 100 kW demonstrator shipped, no cost data, and liquidation in June 2026.
The Verdict
A prototype, then the end
South Beach took Sakowin's plasma process from the laboratory to a demonstrator in an industrial setting. Sources reviewed show no later round to commercialise it, and the company is now in liquidation.
Sakowin, its liquidator and the EIC have not been asked for comment for this article. It is based entirely on public records and published statements, linked throughout.
Industry
EnergyHydrogen technologies
- Focus
- Hydrogen production
- Technologies
- Plasma technology
- Keywords
- Methane pyrolysis
- Turquoise hydrogen
- Solid carbon