SUBRA and the EIC Accelerator: Superconducting Cables Scale Up

30 September 20261,012 words6 min

SUBRA, based in Farum north of Copenhagen, develops Subracable, which bundles filaments of high-temperature superconductor into round wires instead of the usual flat tapes, aiming at cables that can carry gigawatts of electricity with almost no loss when cooled. It was selected in the EIC Accelerator's March 2023 cut-off and was awarded an EU contribution of €2.50 million for SUBRACABLE, "Making Superconducting power grids a feasible solution for Europe", a €3.57 million project that ran from September 2023 to August 2025, according to CORDIS.

The project is closed. Its final report states that SUBRA validated each stage of manufacturing at pilot scale, built custom machines, a cryogenic quality control system testing cables at up to 1,000 amperes, and "a fully operational pilot facility", with continuous production yields above 80%, according to the CORDIS reporting page. Its 2025 annual report says samples sent to customers "resulted in an order from a customer marking the first major sale for Subra", for delivery in 2026, and that in April 2026 "the company received EUR 40 million in new equity", according to filings with the Danish Business Authority.

€2.50MEU grant
€40MNew equity, April 2026
DKK 43.8MNet loss, 2025
1stMajor commercial order, end 2025

Company file

Legal entity
SUBRA A/S, CVR 35643303, Farum
Product
Subracable, bundled high-temperature superconductor
Investors named
Novo Holdings (led April 2026 Series A), Maj Invest, SPRIND, Bayern Kapital
New site
Måløv, Denmark, for large-scale production
Other markets
Fusion diagnostics, neutron scattering, accelerator magnets
Staff
28 average in 2025; 40+ stated
EIC funding
Grant first

Where SUBRA Stands Now

SUBRA signed a lease in Måløv to establish large-scale production of Subracable, and completed its €40 million equity raise in April 2026, its annual report says. Novo Holdings, which provided a convertible loan at the end of 2024, converted it into equity in the same raise. Novo Holdings says it led the €40 million Series A with Maj Invest and SPRIND, and that the round supports SUBRA's acquisition of the German superconductor maker THEVA, according to its 10 April 2026 release. A second closing of €10 million from Bayern Kapital in July 2026 brought the Series A to €50 million, according to THEVA. The company also works on superconductor-based diagnostics for fusion machines and neutron scattering facilities, and on magnet designs in the Horizon Europe HyLICAL liquid hydrogen project.

The record

From pilot line to a €40M raise

SUBRA finished its EIC project with a working pilot production line, won its first commercial order and raised €40M of new equity in April 2026.

  1. Mar 2023EIC Accelerator cut-offSUBRACABLEgrant first
  2. Sep 2023Project starts€2.50M EU grant
  3. Late 2024Novo Holdings convertible loanLater converted to equity
  4. Aug 2025Project endsPilot facility operational
  5. End 2025First major saleSubracable order, delivery in 2026
  6. Apr 2026€40M new equityFor large-scale production in Måløv

CORDIS and SUBRA A/S annual report 2025.

"This resulted in an order from a customer marking the first major sale for Subra. This Subracable will be fully produced and delivered during 2026."

SUBRA A/S, annual report 2025

The Technology: Round Wires From Flat Tapes

High-temperature superconductors are usually made as flat tapes, which are hard to bend and bundle into cables. SUBRA makes filamented superconductor and bundles it into wires, with metallisation to control heat and mechanical behaviour, its reports say. The company claims its cable would cut energy losses by 90%, copper use by 99% and the levelised cost of transmission by 55% (the CORDIS fact sheet gives about 75% for transmission cost). The final report presents these as projections without supporting test data, and the sources reviewed on 7 November 2026 do not include independent verification.

The claims

Benefits SUBRA claims for its cable

The company says Subracable would cut energy losses by 90%, copper use by 99% and the levelised cost of transmission by 55%. These are its own projections; the CORDIS fact sheet gives about 75% for transmission cost.

SUBRA, final report to the EIC (CORDIS). Values in % reduction.

What the EIC Award Promised, and What the Record Shows

The award aimed to make superconducting power grids feasible by proving Subracable could be produced at scale. The final report documents an operational pilot line and a commercially relevant long superconducting strand tested successfully at cryogenic temperatures; it describes testing a full-length cable at 1,000 A as an aim, without reporting the result. The company followed with a first commercial order. Sources reviewed on 7 November 2026 do not show a grid installation.

  1. Pilot production lineDeliveredOperational by 2025.
  2. Quality controlDeliveredTest system rated to 1,000 A.
  3. First customerDeliveredOrder at end of 2025.
  4. Grid deploymentNot yetNone found, Nov 2026.

The Money

SUBRA's net loss rose from DKK 6.1 million in 2024 to DKK 43.8 million in 2025, and equity was minus DKK 60.9 million at the end of 2025, carried by DKK 79.4 million of long-term liabilities. The April 2026 raise and the loan conversion addressed that. The customer and value of the first order are not named.

The losses

SUBRA's annual net loss

Losses jumped to DKK 43.8M in 2025 as the company scaled up. Equity was minus DKK 60.9M at year end, before the 2026 raise.

SUBRA A/S annual reports, Danish Business Authority. Values in DKK millions.

The team

Average employees

Staff grew from 3 in 2021 to 28 on average in 2025; the company says its team is now over 40.

SUBRA A/S annual reports, Danish Business Authority.

What Cannot Be Checked

Questions for the EIC

Who placed the first order and for what, and when a Subracable will carry power in a real grid, are not stated in the sources reviewed.

Why Europe Should Care

The final report says Europe's planned grid expansion with conventional cables would need 37 million tonnes of copper, double annual world production. A cable that uses almost none would ease that bottleneck. SUBRA has moved from a pilot to financed industrialisation with EIC support along the way.

What the award promised

A scalable, cost-effective superconducting cable made at pilot scale.

What the record shows

A working pilot line, a first commercial order and €40 million to build a factory.

The Verdict

Delivered and funded

By its own reports, SUBRA did what the EIC paid for and has raised the money for the next step. Its cable now has to prove itself in the grid.

SUBRA and the EIC have not been asked for comment for this article. It is based entirely on public records and published statements, linked throughout.

Industry

EnergyGrid infrastructure

Focus
  • Grid equipment
Technologies
  • Superconducting magnets
Keywords
  • Superconducting cables
  • Power transmission
  • Fusion energy
  • Copper reduction
  • Superconductors