Water Challenge and the EIC Accelerator: Cleaning Port Sludge
Water Challenge, founded in Madrid in 2020, developed ASEC (adiabatic sonic evaporation and crystallisation), a process that separates polluted liquids into water and dry solids without chemicals. Its EIC application said it had "the first energy-efficient truly Zero Liquid Discharge (ZLD+) technology able to separate 100% of dredged material into fresh water and crystalized solids in one step", and aimed "to develop a pilot plant of 10 m3/day of capacity" to showcase it before replicating it across Europe, according to CORDIS.
The European Innovation Council granted €2,458,928 towards a €3.51 million project from March 2023 to February 2025. The final report says the pilot plant was built and tested at the company's site, then installed in the Port of Huelva, where it "is fully operative with a depuration capacity of 10m3/d", producing distilled water and crystallised solids and powered in part by renewable energy. It says the technology reached TRL 7, and notes that the solids from mining-polluted sediments near Huelva contain critical raw materials of commercial value. The report also says that thanks to "Equity and the participation of the European Investment Bank (EIB)" the company expanded internationally, a claim not confirmed by any EIB announcement found for this article.
Company file
- Legal entity
- Water Challenge S.L., Madrid
- Founded
- December 2020
- Technology
- ASEC, adiabatic sonic evaporation and crystallisation
- Pilot site
- Port of Huelva
- Programmes
- Moeve Light Up, 2025-26
- EIC project
- 1 Mar 2023 to 28 Feb 2025, closed
- EIC funding
- Grant first
Where Water Challenge Stands Now
In June 2025 Water Challenge was one of nine start-ups chosen for Moeve Light Up, the start-up accelerator of the Spanish energy company Moeve, according to a Moeve press release; its own blog says there were more than 300 applicants and that it would develop an industrial pilot with Moeve's technical team. In October 2026 it was among the start-ups presenting pilot results at the programme's Demo Day, ESdiario reported, without details of its results. It has also presented ASEC for biogas and biomethane plants. Its annual turnover is between €500,000 and €1 million, Empresia reports. Sources reviewed on 7 November 2026 do not show a commercial plant or port contract.
The record
From lab to a pilot plant in the Port of Huelva
Water Challenge built its ASEC pilot plant, tested it in-house and installed it in the Port of Huelva, where it treats 10 m3 of dredged material a day. In June 2025 it was picked for Moeve's start-up accelerator.
- Dec 2020Company foundedMadrid
- Oct 2022EIC Accelerator cut-offASECgrant first
- Mar 2023EIC project starts€3.51M project€2.46M grant
- 2023-24Pilot plant builtTested in-house, then moved to Huelva
- Feb 2025EIC project ends10 m3/day pilot at TRL 7 in the port
- Jun 2025Moeve Light UpOne of 9 start-ups; industrial pilot planned
- Oct 2026Moeve Demo DayPilot results presented
CORDIS, Moeve, ESdiario and Water Challenge.
"This milestone is a shuttle for the technology; it works as demo for other ports."
Water Challenge, final report to the EICThe Technology: Evaporate, Crystallise, Reuse
Dredging keeps ports and rivers navigable but produces huge volumes of sediment, 20-40% of it highly polluted, which is usually dumped at sea or in landfills, the application says. ASEC evaporates the water and crystallises the solids with low energy use, so both can be reused. Water Challenge now also pitches it for industrial liquid waste, saying it can reuse 100% of the water in contaminated fluids.
The problem
Sediment dredged each year and how much is highly polluted
The application says more than 2 billion cubic metres of sediment are dredged each year, of which 20-40% is highly polluted and must be treated.
CORDIS project 190180588, fact sheet. Values in billion cubic metres.
What the EIC Project Promised, and What CORDIS Shows
The EIC project
The EU contribution covers 70% of a €3.5M project
The ASEC project ran from March 2023 to February 2025. CORDIS lists it as closed.
CORDIS project 190180588. Values in € millions.
The project promised a 10 m³/day pilot to demonstrate the technology and business model. The report documents the pilot running in a real port at the target capacity, with lab validation of its outputs. It reports energy use of 19.12 kWh per cubic metre against a target below 20, but no operating costs, and it mentions new customers without naming any or reporting a contract. CORDIS lists the project as closed.
- 10 m³/day pilot plantDeliveredPort of Huelva.
- Validated outputsDeliveredWater and solids tested.
- Business model shownUnverifiedNo contract found.
- Replication in EuropeUnverifiedNone found.
The Money
The grant was worth more than twice Water Challenge's annual turnover. The report's reference to EIB participation could not be matched to a public EIB operation. The company's investors, profit or loss, and any EIC Fund investment are not public.
The business
EIC grant against Water Challenge's annual sales band
Empresia reports annual turnover between €500,000 and €1,000,000.
CORDIS; Empresia. Values in € millions.
What Cannot Be Checked
Questions for the EIC
What the pilot's cost per cubic metre is, whether any port has ordered a plant, what EIB involvement the report refers to, and what the Moeve pilot achieved are not public.
Why Europe Should Care
Polluted dredged sediment is a costly problem for European ports, and recovering water and raw materials from it fits EU circular economy goals. The EIC funded a working pilot in a Spanish port. Public proof that ports will pay for it was not found.
What the project promised
A 10 m³/day pilot to showcase zero-liquid-discharge treatment of dredged material before European rollout.
What the record shows
A working pilot in Huelva at TRL 7, a Moeve programme place, and reported turnover under €1 million.
The Verdict
Pilot delivered, market unproven
Water Challenge built the plant the EIC grant co-funded and ran it in a port. Sources reviewed do not show that demonstration turning into commercial orders yet.
Water Challenge and the EIC have not been asked for comment for this article. It is based entirely on public records and published statements, linked throughout.
Industry
Climate and environmentWater management
- Focus
- Water treatment
- Technologies
- Separation technology
- Keywords
- Dredged sediment
- Ports
- Zero liquid discharge
- Industrial liquid waste
- Thermal separation