Zigrid and the EIC Accelerator: Electricity From Lukewarm Heat

30 September 2026887 words5 min

Zigrid, based in Nora, Sweden, builds power modules that turn low-grade waste heat, at temperatures between about 50°C and 90°C, into electricity: the heat expands a gas, which then cools and contracts, and the cyclical motion drives a generator through hydraulics rather than a turbine. It was selected in the EIC Accelerator's June 2023 cut-off, which the company described as an "EIC Innovation Grant first", and received an EU grant of €2.50 million for a €4.15 million project from March 2024 to August 2026 to upgrade its power module and take it to market, according to CORDIS and Zigrid.

The first report, to February 2025, says Zigrid moved to a stand-alone power module with more cylinders and an optimised drivetrain, reporting "efficiency gains exceeding 50%", extended the lower limit of its operating range from 60°C to 50°C and showed "net power production at only 40°C", according to the CORDIS reporting page. Because green hydrogen projects in Europe and the US were delayed, the planned pilot "will likely shift to an AI DataCenter". A July 2026 CORDIS article says data centres have become Zigrid's "most strategic segment" and that the focus "now is on certification, scaling up production capacity" and customer agreements, according to CORDIS.

€2.50MEU grant
40°CLowest heat for net power, per company
SEK 117kNet sales, 2025
0Data-centre installations announced

Company file

Legal entity
Zigrid AB, org. 556879-9091, Nora
Project coordinator
Lars Birging
Product
Power module for 50-90°C heat
Pilot sites
BAETTR foundry, Guldsmedshyttan
Certification partner
RISE
Business model
Zigrid-as-a-Service
EIC funding
Grant first, per company

Where Zigrid Stands Now

Zigrid's accounts show net sales of SEK 117,000 in 2025, its first, against SEK 13.2 million of other income, a net loss of SEK 0.85 million and cash of SEK 1.9 million at year end, according to Allabolag. Its balance sheet carries SEK 22.9 million of capitalised development. In September 2026 it attended Climate Week in New York to meet potential partners, according to its news page. No data-centre pilot, certification or customer contract has been announced.

The record

From foundry pilot to a data-centre pitch

Zigrid redesigned its power module during the EIC project and turned its target market from hydrogen producers to AI data centres. No data-centre installation has been announced.

  1. Jun 2023EIC Accelerator cut-offZiGrid Technology
  2. Sep 2023Pilot at BAETTR foundryGuldsmedshyttan
  3. Dec 2023Grant agreement signed€2.50M
  4. Mar 2024Project startsUpgraded power module
  5. Feb 2025Stand-alone moduleOver 50% efficiency gain, per company
  6. Jul 2026CORDIS results articleData centres now main segment
  7. Aug 2026Project endsCertification still the focus

Zigrid, CORDIS and Allabolag.

"Given the upgraded power module's enhanced adaptability and efficiency... the pilot will likely shift to an AI DataCenter."

Zigrid, first periodic report to the EIC

The Technology: No Turbine Needed

Around 70% of the energy the world produces is lost as heat, the CORDIS article says, and recovering heat below 100°C is usually uneconomic. Zigrid's volumetric machine avoids turbines, which it says makes it more efficient at low temperatures and able to work down to 50°C. Its report says heat from liquid-cooled AI data centres suits the technology, which is why the company now targets them.

The technology

How cool the heat source can be

Zigrid extended the lower limit of its warm-side temperature range from 60°C to 50°C and says it produced net power from heat at only 40°C.

Zigrid, first periodic report (CORDIS). Degrees Celsius.

What the EIC Award Promised, and What the Record Shows

The award aimed to upgrade the power module, add IoT monitoring, demonstrate the system and certify it. Zigrid did the redesign and testing and connected its modules to an IoT platform. The demonstration shifted from hydrogen to data centres and has not been reported, and certification was still the priority when the project ended.

  1. Upgraded power moduleDeliveredStand-alone design.
  2. IoT platformDeliveredLive data streams.
  3. System demonstrationUnverifiedPilot moved to data centres.
  4. CertificationNot completeStill the focus in 2026.

The Money

The EU grant covered 60% of the project. Zigrid lost SEK 12.7 million over 2021 to 2025, financed largely by grants and capital injections. No EIC Fund investment or private funding round has been announced.

The accounts

Other income against net result

Zigrid's income has come almost entirely from grants and other non-sales sources. Its first net sales, SEK 117,000, came in 2025.

Allabolag, from Swedish annual accounts. Values in SEK thousands.

The project budget

Who paid for the €4.15M project

The EU grant covered 60% of the ZiGrid Technology project's cost.

CORDIS, project 101145296. Values in € millions.

What Cannot Be Checked

Questions for the EIC

Whether any data centre has installed a Zigrid module, whether certification is complete, how the company will fund production, and whether the EIC Fund will invest are not public.

Why Europe Should Care

Europe's industry and data centres throw away enormous amounts of warm water. A machine that turns it into electricity would cut energy costs and emissions. Zigrid has been working on the problem for more than a decade; its accounts show the market has not yet paid for it.

What the award promised

A certified, market-ready power module turning low-grade heat into electricity.

What the record shows

An improved module, a new target market and SEK 117,000 of sales.

The Verdict

Better machine, no market yet

Zigrid reports it upgraded its power module with EIC money and now calls data centres its most strategic segment. It has not yet shown a paying customer at scale.

Zigrid and the EIC have not been asked for comment for this article. It is based entirely on public records and published statements, linked throughout.

Industry

EnergyPower generation

Focus
  • Power generation equipment
Technologies
  • Waste heat recovery
  • Hydraulic engineering
Keywords
  • Low-grade heat
  • Data centres
  • Foundries
  • Liquid-cooled servers